Showing 1 - 15 results of 15 for search 'Minh Bui Vu (22683661)', सवाल का समय: 0.02सेकंड परिणाम को परिष्कृत करें
  1. 1
  2. 2

    Outage probability versus power allocation factors, with m = 2, = = 1 [BPCU] and = 5 [dB]. द्वारा Minh Tran (7698803)

    प्रकाशित 2025
    अन्य लेखक: “…Minh Bui Vu (22683661)…”
  3. 3
  4. 4

    Outage probability versus the transmit power , with N = 4 and = 5 [dB]. द्वारा Minh Tran (7698803)

    प्रकाशित 2025
    अन्य लेखक: “…Minh Bui Vu (22683661)…”
  5. 5

    Ergodic data rate versus the transmit power , with N = 5, m = 1, = 0.1, = 0.9 and = 5 [dB]. द्वारा Minh Tran (7698803)

    प्रकाशित 2025
    अन्य लेखक: “…Minh Bui Vu (22683661)…”
  6. 6

    Outage probability versus the transmit power budget in Relay link and ARIS/PRIS link, with N = 2, m = 1, = = 1 [BPCU] and = 10 [dB]. द्वारा Minh Tran (7698803)

    प्रकाशित 2025
    अन्य लेखक: “…Minh Bui Vu (22683661)…”
  7. 7

    Comparison of this work with existing studies (✓: considered; ✗: not considered). द्वारा Minh Tran (7698803)

    प्रकाशित 2025
    अन्य लेखक: “…Minh Bui Vu (22683661)…”
  8. 8

    Outage probability versus the transmit power budget, with N = 5, m = 1 and = 5 [dBm]. द्वारा Minh Tran (7698803)

    प्रकाशित 2025
    अन्य लेखक: “…Minh Bui Vu (22683661)…”
  9. 9

    System throughput versus the transmit power budget, with m = 1, = 0.1, = 0.9 and = 5 [dB]. द्वारा Minh Tran (7698803)

    प्रकाशित 2025
    अन्य लेखक: “…Minh Bui Vu (22683661)…”
  10. 10

    MATLAB_code. द्वारा Minh Tran (7698803)

    प्रकाशित 2025
    अन्य लेखक: “…Minh Bui Vu (22683661)…”
  11. 11

    Outage probability versus the reflection amplitude factors , with N = 8, m = 1, = 10 [dB] and = = 1.5 [BPCU]. द्वारा Minh Tran (7698803)

    प्रकाशित 2025
    अन्य लेखक: “…Minh Bui Vu (22683661)…”
  12. 12

    Outage probability versus the transmit power budget, with N = 5, = 5, m = 1, = 5 [dBm] and = = 1.5 [BPCU]. द्वारा Minh Tran (7698803)

    प्रकाशित 2025
    अन्य लेखक: “…Minh Bui Vu (22683661)…”
  13. 13

    Ergodic data rate versus the reflection amplitude factors , with N = 4, m = 1 and = 5 [dB]. द्वारा Minh Tran (7698803)

    प्रकाशित 2025
    अन्य लेखक: “…Minh Bui Vu (22683661)…”
  14. 14

    Ergodic data rate versus the number of elements N, with = 5, m = 1 and power budget = 15 [dB]. द्वारा Minh Tran (7698803)

    प्रकाशित 2025
    अन्य लेखक: “…Minh Bui Vu (22683661)…”
  15. 15

    Main parameters for our simulations [59]. द्वारा Minh Tran (7698803)

    प्रकाशित 2025
    अन्य लेखक: “…Minh Bui Vu (22683661)…”