Visas 1 - 15 av 15 resultat för sökning 'Minh Bui Vu (22683661)', Sökningstid: 0,01s
Förfina resultatet
-
1
Energy efficiency in delay-limited and delay-tolerant transmission mode, with <i>N</i> = 4, <i>m</i> = 1, = 2/3, = 10 dBw, = 4 dBw, = 10 dBm, = 10 dBm and = 10 dBm. av Minh Tran (7698803)
Publicerad 2025Övriga upphovsmän: “…Minh Bui Vu (22683661)…”
-
2
Outage probability versus power allocation factors, with m = 2, = = 1 [BPCU] and = 5 [dB]. av Minh Tran (7698803)
Publicerad 2025Övriga upphovsmän: “…Minh Bui Vu (22683661)…”
-
3
The system model of ARIS-assisted NOMA spectrum-sharing communications, with ARIS capable of boosting superposed signals and reflecting them to users. av Minh Tran (7698803)
Publicerad 2025Övriga upphovsmän: “…Minh Bui Vu (22683661)…”
-
4
Outage probability versus the transmit power , with N = 4 and = 5 [dB]. av Minh Tran (7698803)
Publicerad 2025Övriga upphovsmän: “…Minh Bui Vu (22683661)…”
-
5
Ergodic data rate versus the transmit power , with N = 5, m = 1, = 0.1, = 0.9 and = 5 [dB]. av Minh Tran (7698803)
Publicerad 2025Övriga upphovsmän: “…Minh Bui Vu (22683661)…”
-
6
Outage probability versus the transmit power budget in Relay link and ARIS/PRIS link, with N = 2, m = 1, = = 1 [BPCU] and = 10 [dB]. av Minh Tran (7698803)
Publicerad 2025Övriga upphovsmän: “…Minh Bui Vu (22683661)…”
-
7
Comparison of this work with existing studies (✓: considered; ✗: not considered). av Minh Tran (7698803)
Publicerad 2025Övriga upphovsmän: “…Minh Bui Vu (22683661)…”
-
8
Outage probability versus the transmit power budget, with N = 5, m = 1 and = 5 [dBm]. av Minh Tran (7698803)
Publicerad 2025Övriga upphovsmän: “…Minh Bui Vu (22683661)…”
-
9
System throughput versus the transmit power budget, with m = 1, = 0.1, = 0.9 and = 5 [dB]. av Minh Tran (7698803)
Publicerad 2025Övriga upphovsmän: “…Minh Bui Vu (22683661)…”
-
10
-
11
Outage probability versus the reflection amplitude factors , with N = 8, m = 1, = 10 [dB] and = = 1.5 [BPCU]. av Minh Tran (7698803)
Publicerad 2025Övriga upphovsmän: “…Minh Bui Vu (22683661)…”
-
12
Outage probability versus the transmit power budget, with N = 5, = 5, m = 1, = 5 [dBm] and = = 1.5 [BPCU]. av Minh Tran (7698803)
Publicerad 2025Övriga upphovsmän: “…Minh Bui Vu (22683661)…”
-
13
Ergodic data rate versus the reflection amplitude factors , with N = 4, m = 1 and = 5 [dB]. av Minh Tran (7698803)
Publicerad 2025Övriga upphovsmän: “…Minh Bui Vu (22683661)…”
-
14
Ergodic data rate versus the number of elements N, with = 5, m = 1 and power budget = 15 [dB]. av Minh Tran (7698803)
Publicerad 2025Övriga upphovsmän: “…Minh Bui Vu (22683661)…”
-
15
Main parameters for our simulations [59]. av Minh Tran (7698803)
Publicerad 2025Övriga upphovsmän: “…Minh Bui Vu (22683661)…”