1 - 15 toradh á dtaispeáint as 15 toradh san iomlán ar an gcuardach 'Minh Tran (7698803)', am iarratais: 0.01s
Beachtaigh na torthaí
-
1
-
2
Outage probability versus power allocation factors, with m = 2, = = 1 [BPCU] and = 5 [dB]. de réir Minh Tran (7698803)
Foilsithe / Cruthaithe 2025 -
3
-
4
Outage probability versus the transmit power , with N = 4 and = 5 [dB]. de réir Minh Tran (7698803)
Foilsithe / Cruthaithe 2025 -
5
Ergodic data rate versus the transmit power , with N = 5, m = 1, = 0.1, = 0.9 and = 5 [dB]. de réir Minh Tran (7698803)
Foilsithe / Cruthaithe 2025 -
6
-
7
Comparison of this work with existing studies (✓: considered; ✗: not considered). de réir Minh Tran (7698803)
Foilsithe / Cruthaithe 2025 -
8
Outage probability versus the transmit power budget, with N = 5, m = 1 and = 5 [dBm]. de réir Minh Tran (7698803)
Foilsithe / Cruthaithe 2025 -
9
System throughput versus the transmit power budget, with m = 1, = 0.1, = 0.9 and = 5 [dB]. de réir Minh Tran (7698803)
Foilsithe / Cruthaithe 2025 -
10
-
11
Outage probability versus the reflection amplitude factors , with N = 8, m = 1, = 10 [dB] and = = 1.5 [BPCU]. de réir Minh Tran (7698803)
Foilsithe / Cruthaithe 2025 -
12
Outage probability versus the transmit power budget, with N = 5, = 5, m = 1, = 5 [dBm] and = = 1.5 [BPCU]. de réir Minh Tran (7698803)
Foilsithe / Cruthaithe 2025 -
13
Ergodic data rate versus the reflection amplitude factors , with N = 4, m = 1 and = 5 [dB]. de réir Minh Tran (7698803)
Foilsithe / Cruthaithe 2025 -
14
Ergodic data rate versus the number of elements N, with = 5, m = 1 and power budget = 15 [dB]. de réir Minh Tran (7698803)
Foilsithe / Cruthaithe 2025 -
15