A Tabu Search Algorithm For Maintenance Scheduling Of Generating Units
A new heuristic algorithm based on the Tabu search has been proposed for the maintenance schedule (MS) of electric generation units. The algorithm was developed, implemented and tested on an integrated model for the MS problem. The model. used two criteria: minimizing the total generator operating c...
محفوظ في:
| المؤلف الرئيسي: | |
|---|---|
| مؤلفون آخرون: | , , |
| التنسيق: | article |
| منشور في: |
2020
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | https://eprints.kfupm.edu.sa/id/eprint/1979/1/a_tabu_search_algorithm_for_maintenance__el_amin_isi_000086759500003.doc |
| الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
| _version_ | 1864513390212284416 |
|---|---|
| author | El-Amin, I. |
| author2 | Duffuaa, S. O. Abbas, M.Baber unknown |
| author2_role | author author author |
| author_facet | El-Amin, I. Duffuaa, S. O. Abbas, M.Baber unknown |
| author_role | author |
| dc.creator.none.fl_str_mv | El-Amin, I. Duffuaa, S. O. Abbas, M.Baber unknown |
| dc.date.*.fl_str_mv | 2020 |
| dc.format.none.fl_str_mv | application/msword |
| dc.identifier.none.fl_str_mv | https://eprints.kfupm.edu.sa/id/eprint/1979/1/a_tabu_search_algorithm_for_maintenance__el_amin_isi_000086759500003.doc A Tabu Search Algorithm For Maintenance Scheduling Of Generating Units. Electric Power Systems Research, 54. pp. 91-99. |
| dc.language.none.fl_str_mv | en |
| dc.publisher.none.fl_str_mv | ELSEVIER SCIENCE SA |
| dc.relation.none.fl_str_mv | https://eprints.kfupm.edu.sa/id/eprint/1979/ http://isi.kfupm.edu.sa/journals/doc/A/a_tabu_search_algorithm_for_maintenance__el_amin_isi_000086759500003.doc |
| dc.rights.*.fl_str_mv | info:eu-repo/semantics/openAccess |
| dc.subject.none.fl_str_mv | Systems |
| dc.title.none.fl_str_mv | A Tabu Search Algorithm For Maintenance Scheduling Of Generating Units |
| dc.type.none.fl_str_mv | Article PeerReviewed info:eu-repo/semantics/publishedVersion info:eu-repo/semantics/article |
| description | A new heuristic algorithm based on the Tabu search has been proposed for the maintenance schedule (MS) of electric generation units. The algorithm was developed, implemented and tested on an integrated model for the MS problem. The model. used two criteria: minimizing the total generator operating cost and levering the reserve. Each of the above criteria is used with the following constraints: maintenance completion, crew size, precedence, reserve and reserve constants. The performance of the Tabu search algorithm is promising. The Tabu search algorithm solved two power system problems, 4 units and 22 units. The implicit enumeration algorithm was used to check the validity and the quality of the Tabu search solution. (C) 2000 Published by Elsevier Science S.A. All rights reserved. |
| eu_rights_str_mv | openAccess |
| format | article |
| id | KFUPM_332efe91ce4eaf5268e93a2cded8ade0 |
| identifier_str_mv | A Tabu Search Algorithm For Maintenance Scheduling Of Generating Units. Electric Power Systems Research, 54. pp. 91-99. |
| language_invalid_str_mv | en |
| network_acronym_str | KFUPM |
| network_name_str | King Fahd University of Petroleum and Minerals |
| oai_identifier_str | oai::1979 |
| publishDate | 2020 |
| publisher.none.fl_str_mv | ELSEVIER SCIENCE SA |
| repository.mail.fl_str_mv | |
| repository.name.fl_str_mv | |
| repository_id_str | |
| spelling | A Tabu Search Algorithm For Maintenance Scheduling Of Generating UnitsEl-Amin, I.Duffuaa, S. O.Abbas, M.BaberunknownSystemsA new heuristic algorithm based on the Tabu search has been proposed for the maintenance schedule (MS) of electric generation units. The algorithm was developed, implemented and tested on an integrated model for the MS problem. The model. used two criteria: minimizing the total generator operating cost and levering the reserve. Each of the above criteria is used with the following constraints: maintenance completion, crew size, precedence, reserve and reserve constants. The performance of the Tabu search algorithm is promising. The Tabu search algorithm solved two power system problems, 4 units and 22 units. The implicit enumeration algorithm was used to check the validity and the quality of the Tabu search solution. (C) 2000 Published by Elsevier Science S.A. All rights reserved.ELSEVIER SCIENCE SAArticlePeerReviewedinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/articleapplication/mswordhttps://eprints.kfupm.edu.sa/id/eprint/1979/1/a_tabu_search_algorithm_for_maintenance__el_amin_isi_000086759500003.doc A Tabu Search Algorithm For Maintenance Scheduling Of Generating Units. Electric Power Systems Research, 54. pp. 91-99. enhttps://eprints.kfupm.edu.sa/id/eprint/1979/http://isi.kfupm.edu.sa/journals/doc/A/a_tabu_search_algorithm_for_maintenance__el_amin_isi_000086759500003.doc2020info:eu-repo/semantics/openAccessoai::19792019-11-01T13:30:02Z |
| spellingShingle | A Tabu Search Algorithm For Maintenance Scheduling Of Generating Units El-Amin, I. Systems |
| status_str | publishedVersion |
| title | A Tabu Search Algorithm For Maintenance Scheduling Of Generating Units |
| title_full | A Tabu Search Algorithm For Maintenance Scheduling Of Generating Units |
| title_fullStr | A Tabu Search Algorithm For Maintenance Scheduling Of Generating Units |
| title_full_unstemmed | A Tabu Search Algorithm For Maintenance Scheduling Of Generating Units |
| title_short | A Tabu Search Algorithm For Maintenance Scheduling Of Generating Units |
| title_sort | A Tabu Search Algorithm For Maintenance Scheduling Of Generating Units |
| topic | Systems |
| url | https://eprints.kfupm.edu.sa/id/eprint/1979/1/a_tabu_search_algorithm_for_maintenance__el_amin_isi_000086759500003.doc |