Integrated Single Vendor Single Buyer Model With Stochastic Demand And Variable Lead Time
In this paper, we consider the single vendor single buyer integrated production inventory problem. We relax the assumption of deterministic demand and assume that the lead time is varying lineraly with the lot size. The lead time is composed of a lot size-dependent run time and constant delay times...
Saved in:
| Main Author: | Bendaya, M. (author) |
|---|---|
| Other Authors: | Hariga, M (author), unknown (author) |
| Format: | article |
| Published: |
2020
|
| Subjects: | |
| Online Access: | https://eprints.kfupm.edu.sa/id/eprint/2478/1/integrated_production_maintenance_and_qu_ben_daya_isi_000081557800002.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Single Vendor Multi Buyers Supply Chain Optimization
by: unknown
Published: (2020) -
SINGLE VENDOR MULTI BUYER PRODUCTION REMANUFACTURING SYSTEM
by: unknown
Published: (2020) -
Integrated Inventory And Inspection Policies For Stochastic Demand
by: Bendaya, M.
Published: (2020) -
Production And Shipment Lot Sizing In A Vendor-Buyer Supply Chain With Transportation Cost
by: Darwish, M.
Published: (2020) -
Lead-Time Reduction In A Stochastic Inventory System With Learning Consideration
by: Bendaya, M.
Published: (2020)