A COMPLETE INSPECTION PLAN FOR DEPENDENT MULTICHARACTERISTIC CRITICAL COMPONENTS
Here a complete inspection plan for critical components with several characteristics is designed for the case where the characteristics' defective rates are statistically dependent. The plan minimizes total expected cost resulting from type-I and II errors and the cost of inspection. A mathemat...
Saved in:
| Main Author: | |
|---|---|
| Other Authors: | , |
| Format: | article |
| Published: |
2020
|
| Subjects: | |
| Online Access: | https://eprints.kfupm.edu.sa/id/eprint/1971/1/a_complete_inspection_plan_for_dependent_duffuaa_isi_a1994nx92000010.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| _version_ | 1864513381755518976 |
|---|---|
| author | Duffuaa, S. O. |
| author2 | Nadeem, I.A. unknown |
| author2_role | author author |
| author_facet | Duffuaa, S. O. Nadeem, I.A. unknown |
| author_role | author |
| dc.creator.none.fl_str_mv | Duffuaa, S. O. Nadeem, I.A. unknown |
| dc.date.*.fl_str_mv | 2020 |
| dc.format.none.fl_str_mv | application/pdf |
| dc.identifier.none.fl_str_mv | https://eprints.kfupm.edu.sa/id/eprint/1971/1/a_complete_inspection_plan_for_dependent_duffuaa_isi_a1994nx92000010.pdf A COMPLETE INSPECTION PLAN FOR DEPENDENT MULTICHARACTERISTIC CRITICAL COMPONENTS. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 32. pp. 1897-1907. |
| dc.language.none.fl_str_mv | en |
| dc.publisher.none.fl_str_mv | TAYLOR FRANCIS LTD |
| dc.relation.none.fl_str_mv | https://eprints.kfupm.edu.sa/id/eprint/1971/ http://isi.kfupm.edu.sa/journals/pdf/A/a_complete_inspection_plan_for_dependent_duffuaa_isi_a1994nx92000010.pdf |
| dc.rights.*.fl_str_mv | info:eu-repo/semantics/openAccess |
| dc.subject.none.fl_str_mv | Systems |
| dc.title.none.fl_str_mv | A COMPLETE INSPECTION PLAN FOR DEPENDENT MULTICHARACTERISTIC CRITICAL COMPONENTS |
| dc.type.none.fl_str_mv | Article PeerReviewed info:eu-repo/semantics/publishedVersion info:eu-repo/semantics/article |
| description | Here a complete inspection plan for critical components with several characteristics is designed for the case where the characteristics' defective rates are statistically dependent. The plan minimizes total expected cost resulting from type-I and II errors and the cost of inspection. A mathematical model and an algorithm for obtaining the optimal number of repeat inspections are developed and demonstrated by an example. The output of the model is an optimal inspection plan to control the quality of critical components. |
| eu_rights_str_mv | openAccess |
| format | article |
| id | KFUPM_c0647176cd3af93117ab2e33a133bfa5 |
| identifier_str_mv | A COMPLETE INSPECTION PLAN FOR DEPENDENT MULTICHARACTERISTIC CRITICAL COMPONENTS. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 32. pp. 1897-1907. |
| language_invalid_str_mv | en |
| network_acronym_str | KFUPM |
| network_name_str | King Fahd University of Petroleum and Minerals |
| oai_identifier_str | oai::1971 |
| publishDate | 2020 |
| publisher.none.fl_str_mv | TAYLOR FRANCIS LTD |
| repository.mail.fl_str_mv | |
| repository.name.fl_str_mv | |
| repository_id_str | |
| spelling | A COMPLETE INSPECTION PLAN FOR DEPENDENT MULTICHARACTERISTIC CRITICAL COMPONENTSDuffuaa, S. O.Nadeem, I.A.unknownSystemsHere a complete inspection plan for critical components with several characteristics is designed for the case where the characteristics' defective rates are statistically dependent. The plan minimizes total expected cost resulting from type-I and II errors and the cost of inspection. A mathematical model and an algorithm for obtaining the optimal number of repeat inspections are developed and demonstrated by an example. The output of the model is an optimal inspection plan to control the quality of critical components.TAYLOR FRANCIS LTDArticlePeerReviewedinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/articleapplication/pdfhttps://eprints.kfupm.edu.sa/id/eprint/1971/1/a_complete_inspection_plan_for_dependent_duffuaa_isi_a1994nx92000010.pdf A COMPLETE INSPECTION PLAN FOR DEPENDENT MULTICHARACTERISTIC CRITICAL COMPONENTS. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 32. pp. 1897-1907. enhttps://eprints.kfupm.edu.sa/id/eprint/1971/http://isi.kfupm.edu.sa/journals/pdf/A/a_complete_inspection_plan_for_dependent_duffuaa_isi_a1994nx92000010.pdf2020info:eu-repo/semantics/openAccessoai::19712019-11-01T13:30:00Z |
| spellingShingle | A COMPLETE INSPECTION PLAN FOR DEPENDENT MULTICHARACTERISTIC CRITICAL COMPONENTS Duffuaa, S. O. Systems |
| status_str | publishedVersion |
| title | A COMPLETE INSPECTION PLAN FOR DEPENDENT MULTICHARACTERISTIC CRITICAL COMPONENTS |
| title_full | A COMPLETE INSPECTION PLAN FOR DEPENDENT MULTICHARACTERISTIC CRITICAL COMPONENTS |
| title_fullStr | A COMPLETE INSPECTION PLAN FOR DEPENDENT MULTICHARACTERISTIC CRITICAL COMPONENTS |
| title_full_unstemmed | A COMPLETE INSPECTION PLAN FOR DEPENDENT MULTICHARACTERISTIC CRITICAL COMPONENTS |
| title_short | A COMPLETE INSPECTION PLAN FOR DEPENDENT MULTICHARACTERISTIC CRITICAL COMPONENTS |
| title_sort | A COMPLETE INSPECTION PLAN FOR DEPENDENT MULTICHARACTERISTIC CRITICAL COMPONENTS |
| topic | Systems |
| url | https://eprints.kfupm.edu.sa/id/eprint/1971/1/a_complete_inspection_plan_for_dependent_duffuaa_isi_a1994nx92000010.pdf |