Lead-Time Reduction In A Stochastic Inventory System With Learning Consideration

We develop a continuous review inventory model where lead-time is considered as a controllable variable. Lead-time is decomposed into all its components: set-up time, processing time and non-productive time. These components reflect the setup cost reduction, lot size lead-time interaction and lead-t...

وصف كامل

محفوظ في:
التفاصيل البيبلوغرافية
المؤلف الرئيسي: Bendaya, M. (author)
مؤلفون آخرون: Hariga, M (author), unknown (author)
التنسيق: article
منشور في: 2020
الموضوعات:
الوصول للمادة أونلاين:https://eprints.kfupm.edu.sa/id/eprint/2491/1/lead_time_reduction_in_a_stochastic_inve_ben_daya_isi_000180296500009.pdf
الوسوم: إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
_version_ 1864513382436044800
author Bendaya, M.
author2 Hariga, M
unknown
author2_role author
author
author_facet Bendaya, M.
Hariga, M
unknown
author_role author
dc.creator.none.fl_str_mv Bendaya, M.
Hariga, M
unknown
dc.date.*.fl_str_mv 2020
dc.format.none.fl_str_mv application/pdf
dc.identifier.none.fl_str_mv https://eprints.kfupm.edu.sa/id/eprint/2491/1/lead_time_reduction_in_a_stochastic_inve_ben_daya_isi_000180296500009.pdf
Lead-Time Reduction In A Stochastic Inventory System With Learning Consideration. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 41. pp. 571-579.
dc.language.none.fl_str_mv en
dc.publisher.none.fl_str_mv TAYLOR FRANCIS LTD
dc.relation.none.fl_str_mv https://eprints.kfupm.edu.sa/id/eprint/2491/
dc.rights.*.fl_str_mv info:eu-repo/semantics/openAccess
dc.subject.none.fl_str_mv Systems
dc.title.none.fl_str_mv Lead-Time Reduction In A Stochastic Inventory System With Learning Consideration
dc.type.none.fl_str_mv Article
PeerReviewed
info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/article
description We develop a continuous review inventory model where lead-time is considered as a controllable variable. Lead-time is decomposed into all its components: set-up time, processing time and non-productive time. These components reflect the setup cost reduction, lot size lead-time interaction and lead-time crashing, respectively. The learning effect in the production process is also included in the processing time component of the lead-time. The finite investment approach for lead-time and set-up cost reduction and their joint optimization, in addition to the lot size lead-time interaction, introduce a realistic direction in lead-time management and control. A numerical example and a sensitivity analysis are presented using the design of experiments to investigate the effect of the model parameters and, in particular, those related to the different lead-time components on the the expected total cost.
eu_rights_str_mv openAccess
format article
id KFUPM_c2b31ae143a9fa71e83487fe055b08a7
identifier_str_mv Lead-Time Reduction In A Stochastic Inventory System With Learning Consideration. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 41. pp. 571-579.
language_invalid_str_mv en
network_acronym_str KFUPM
network_name_str King Fahd University of Petroleum and Minerals
oai_identifier_str oai::2491
publishDate 2020
publisher.none.fl_str_mv TAYLOR FRANCIS LTD
repository.mail.fl_str_mv
repository.name.fl_str_mv
repository_id_str
spelling Lead-Time Reduction In A Stochastic Inventory System With Learning ConsiderationBendaya, M.Hariga, MunknownSystemsWe develop a continuous review inventory model where lead-time is considered as a controllable variable. Lead-time is decomposed into all its components: set-up time, processing time and non-productive time. These components reflect the setup cost reduction, lot size lead-time interaction and lead-time crashing, respectively. The learning effect in the production process is also included in the processing time component of the lead-time. The finite investment approach for lead-time and set-up cost reduction and their joint optimization, in addition to the lot size lead-time interaction, introduce a realistic direction in lead-time management and control. A numerical example and a sensitivity analysis are presented using the design of experiments to investigate the effect of the model parameters and, in particular, those related to the different lead-time components on the the expected total cost.TAYLOR FRANCIS LTDArticlePeerReviewedinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/articleapplication/pdfhttps://eprints.kfupm.edu.sa/id/eprint/2491/1/lead_time_reduction_in_a_stochastic_inve_ben_daya_isi_000180296500009.pdf Lead-Time Reduction In A Stochastic Inventory System With Learning Consideration. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 41. pp. 571-579. enhttps://eprints.kfupm.edu.sa/id/eprint/2491/2020info:eu-repo/semantics/openAccessoai::24912019-11-01T13:44:26Z
spellingShingle Lead-Time Reduction In A Stochastic Inventory System With Learning Consideration
Bendaya, M.
Systems
status_str publishedVersion
title Lead-Time Reduction In A Stochastic Inventory System With Learning Consideration
title_full Lead-Time Reduction In A Stochastic Inventory System With Learning Consideration
title_fullStr Lead-Time Reduction In A Stochastic Inventory System With Learning Consideration
title_full_unstemmed Lead-Time Reduction In A Stochastic Inventory System With Learning Consideration
title_short Lead-Time Reduction In A Stochastic Inventory System With Learning Consideration
title_sort Lead-Time Reduction In A Stochastic Inventory System With Learning Consideration
topic Systems
url https://eprints.kfupm.edu.sa/id/eprint/2491/1/lead_time_reduction_in_a_stochastic_inve_ben_daya_isi_000180296500009.pdf