Evaluation of work sampling as an indicator of construction labor productivity
محفوظ في:
| المؤلف الرئيسي: | |
|---|---|
| مؤلفون آخرون: | |
| التنسيق: | masterThesis |
| منشور في: |
1995
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | https://eprints.kfupm.edu.sa/id/eprint/9920/1/9920.pdf |
| الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
| _version_ | 1864513391984377856 |
|---|---|
| author | Al-Ghamdi, Muhammad Ali Mubarak |
| author2 | unknown |
| author2_role | author |
| author_facet | Al-Ghamdi, Muhammad Ali Mubarak unknown |
| author_role | author |
| dc.creator.none.fl_str_mv | Al-Ghamdi, Muhammad Ali Mubarak unknown |
| dc.date.none.fl_str_mv | 1995-06 2020 |
| dc.format.none.fl_str_mv | application/pdf |
| dc.identifier.none.fl_str_mv | https://eprints.kfupm.edu.sa/id/eprint/9920/1/9920.pdf (1995) Evaluation of work sampling as an indicator of construction labor productivity. Masters thesis, King Fahd University of Petroleum and Minerals. |
| dc.language.none.fl_str_mv | en |
| dc.relation.none.fl_str_mv | https://eprints.kfupm.edu.sa/id/eprint/9920/ |
| dc.rights.*.fl_str_mv | info:eu-repo/semantics/openAccess |
| dc.subject.none.fl_str_mv | Architectural |
| dc.title.none.fl_str_mv | Evaluation of work sampling as an indicator of construction labor productivity |
| dc.type.none.fl_str_mv | Thesis NonPeerReviewed info:eu-repo/semantics/publishedVersion info:eu-repo/semantics/masterThesis |
| eu_rights_str_mv | openAccess |
| format | masterThesis |
| id | KFUPM_d26fde687d2594370a43c73473dc571d |
| identifier_str_mv | (1995) Evaluation of work sampling as an indicator of construction labor productivity. Masters thesis, King Fahd University of Petroleum and Minerals. |
| language_invalid_str_mv | en |
| network_acronym_str | KFUPM |
| network_name_str | King Fahd University of Petroleum and Minerals |
| oai_identifier_str | oai::9920 |
| publishDate | 1995 |
| repository.mail.fl_str_mv | |
| repository.name.fl_str_mv | |
| repository_id_str | |
| spelling | Evaluation of work sampling as an indicator of construction labor productivityAl-Ghamdi, Muhammad Ali MubarakunknownArchitectural1995-062020ThesisNonPeerReviewedinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/masterThesisapplication/pdfhttps://eprints.kfupm.edu.sa/id/eprint/9920/1/9920.pdf (1995) Evaluation of work sampling as an indicator of construction labor productivity. Masters thesis, King Fahd University of Petroleum and Minerals. enhttps://eprints.kfupm.edu.sa/id/eprint/9920/info:eu-repo/semantics/openAccessoai::99202019-11-01T13:52:50Z |
| spellingShingle | Evaluation of work sampling as an indicator of construction labor productivity Al-Ghamdi, Muhammad Ali Mubarak Architectural |
| status_str | publishedVersion |
| title | Evaluation of work sampling as an indicator of construction labor productivity |
| title_full | Evaluation of work sampling as an indicator of construction labor productivity |
| title_fullStr | Evaluation of work sampling as an indicator of construction labor productivity |
| title_full_unstemmed | Evaluation of work sampling as an indicator of construction labor productivity |
| title_short | Evaluation of work sampling as an indicator of construction labor productivity |
| title_sort | Evaluation of work sampling as an indicator of construction labor productivity |
| topic | Architectural |
| url | https://eprints.kfupm.edu.sa/id/eprint/9920/1/9920.pdf |