Repeat Inspection Planning Using Dynamic Programming

In this paper we propose a dynamic programming approach to the problem of determination of the inspection sequence of multi-characteristic critical components, and the number of repeat inspection for each characteristic. The model presented here considers the case of several classification of a prod...

Full description

Saved in:
Bibliographic Details
Main Author: Duffuaa, S. O. (author)
Other Authors: Elshafei, M. (author), Khan, M. (author), unknown (author)
Format: article
Published: 2020
Subjects:
Online Access:https://eprints.kfupm.edu.sa/id/eprint/1944/1/repeat_inspection_planning_using_dynamic_elshafei_isi_000234583900003.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1864513400876302336
author Duffuaa, S. O.
author2 Elshafei, M.
Khan, M.
unknown
author2_role author
author
author
author_facet Duffuaa, S. O.
Elshafei, M.
Khan, M.
unknown
author_role author
dc.creator.none.fl_str_mv Duffuaa, S. O.
Elshafei, M.
Khan, M.
unknown
dc.date.*.fl_str_mv 2020
dc.format.none.fl_str_mv application/pdf
dc.identifier.none.fl_str_mv https://eprints.kfupm.edu.sa/id/eprint/1944/1/repeat_inspection_planning_using_dynamic_elshafei_isi_000234583900003.pdf
Repeat Inspection Planning Using Dynamic Programming. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 44. pp. 257-270.
dc.language.none.fl_str_mv en
dc.publisher.none.fl_str_mv TAYLOR FRANCIS LTD
dc.relation.none.fl_str_mv https://eprints.kfupm.edu.sa/id/eprint/1944/
http://isi.kfupm.edu.sa/journals/pdf/R/repeat_inspection_planning_using_dynamic_elshafei_isi_000234583900003.pdf
dc.rights.*.fl_str_mv info:eu-repo/semantics/openAccess
dc.subject.none.fl_str_mv Systems
dc.title.none.fl_str_mv Repeat Inspection Planning Using Dynamic Programming
dc.type.none.fl_str_mv Article
PeerReviewed
info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/article
description In this paper we propose a dynamic programming approach to the problem of determination of the inspection sequence of multi-characteristic critical components, and the number of repeat inspection for each characteristic. The model presented here considers the case of several classification of a product by an inspector. An inspector could classify a product as non-defective, to be reworked, or to be scrapped, with respect to a certain characteristic. The model accounts as well for possible misclassification by the inspector. The dynamic programming algorithm searches for a solution that minimizes the total cost of inspection per accepted component. The total cost includes the cost of false rejection of good items, the cost due to false acceptance of an item which is either reworkable or to be scrapped, the cost of inspection, and the cost of rework.
eu_rights_str_mv openAccess
format article
id KFUPM_e5a18971e00e9b936a40c148f03c22ef
identifier_str_mv Repeat Inspection Planning Using Dynamic Programming. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 44. pp. 257-270.
language_invalid_str_mv en
network_acronym_str KFUPM
network_name_str King Fahd University of Petroleum and Minerals
oai_identifier_str oai::1944
publishDate 2020
publisher.none.fl_str_mv TAYLOR FRANCIS LTD
repository.mail.fl_str_mv
repository.name.fl_str_mv
repository_id_str
spelling Repeat Inspection Planning Using Dynamic ProgrammingDuffuaa, S. O.Elshafei, M.Khan, M.unknownSystemsIn this paper we propose a dynamic programming approach to the problem of determination of the inspection sequence of multi-characteristic critical components, and the number of repeat inspection for each characteristic. The model presented here considers the case of several classification of a product by an inspector. An inspector could classify a product as non-defective, to be reworked, or to be scrapped, with respect to a certain characteristic. The model accounts as well for possible misclassification by the inspector. The dynamic programming algorithm searches for a solution that minimizes the total cost of inspection per accepted component. The total cost includes the cost of false rejection of good items, the cost due to false acceptance of an item which is either reworkable or to be scrapped, the cost of inspection, and the cost of rework.TAYLOR FRANCIS LTDArticlePeerReviewedinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/articleapplication/pdfhttps://eprints.kfupm.edu.sa/id/eprint/1944/1/repeat_inspection_planning_using_dynamic_elshafei_isi_000234583900003.pdf Repeat Inspection Planning Using Dynamic Programming. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 44. pp. 257-270. enhttps://eprints.kfupm.edu.sa/id/eprint/1944/http://isi.kfupm.edu.sa/journals/pdf/R/repeat_inspection_planning_using_dynamic_elshafei_isi_000234583900003.pdf2020info:eu-repo/semantics/openAccessoai::19442019-11-01T13:29:46Z
spellingShingle Repeat Inspection Planning Using Dynamic Programming
Duffuaa, S. O.
Systems
status_str publishedVersion
title Repeat Inspection Planning Using Dynamic Programming
title_full Repeat Inspection Planning Using Dynamic Programming
title_fullStr Repeat Inspection Planning Using Dynamic Programming
title_full_unstemmed Repeat Inspection Planning Using Dynamic Programming
title_short Repeat Inspection Planning Using Dynamic Programming
title_sort Repeat Inspection Planning Using Dynamic Programming
topic Systems
url https://eprints.kfupm.edu.sa/id/eprint/1944/1/repeat_inspection_planning_using_dynamic_elshafei_isi_000234583900003.pdf