Turnaround Maintenance Planning for a Network of Plants Using Mathematical Programming Model
Saved in:
| Main Author: | unknown (author) |
|---|---|
| Format: | masterThesis |
| Published: |
2020
|
| Subjects: | |
| Online Access: | https://eprints.kfupm.edu.sa/id/eprint/140111/1/TURNAROUND_MAINTENANCE_PLANNING_FOR_A_NETWORK_OF_PLANTS_USING_MATHEMATICAL_PROGRAMMING_MODEL.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Stochastic Simulation Model For Maintenance Manpower Planning
by: Duffuaa, S. O.
Published: (2020) -
A Stochastic Programming Model For Scheduling Maintenance Personnel
by: Duffuaa, S. O.
Published: (2020) -
Developing a Hybrid Model for Network Planning in Abu Dhabi Distribution Company Subsidiary of Adwea
by: Al Haddabi, Aseya Mohammed
Published: (2006) -
Repeat Inspection Planning Using Dynamic Programming
by: Elshafei, M.
Published: (2020) -
Repeat Inspection Planning Using Dynamic Programming
by: Duffuaa, S. O.
Published: (2020)