Benefit and risk analysis of an automatic meter reading system for electricité du Liban

This paper summarizes the benefit and risk analysis of a study for modernizing the electricity metering, billing and revenue collection systems for ´Electricit´e du Liban, the national power company of Lebanon. A cost/benefit analysis of the modernized system shows that the system has a payback period...

Full description

Saved in:
Bibliographic Details
Main Author: Ghajar, Raymond F. (author)
Format: article
Published: 2012
Online Access:http://hdl.handle.net/10725/5557
http://libraries.lau.edu.lb/research/laur/terms-of-use/articles.php
http://www.actapress.com/Abstract.aspx?paperId=42765
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1864513465877528576
author Ghajar, Raymond F.
author_facet Ghajar, Raymond F.
author_role author
dc.creator.none.fl_str_mv Ghajar, Raymond F.
dc.date.none.fl_str_mv 2012
2017-04-28T08:25:23Z
2017-04-28T08:25:23Z
2017-04-28
dc.identifier.none.fl_str_mv 1710-2243
http://hdl.handle.net/10725/5557
10.2316/Journal.203.2012.1.203-3654
Ghajar, R. F. (2012). Benefit and Risk Analysis of an Automatic Meter Reading System for Électricité du Liban. International Journal of Power and Energy Systems, 32(1), 1.
http://libraries.lau.edu.lb/research/laur/terms-of-use/articles.php
http://www.actapress.com/Abstract.aspx?paperId=42765
dc.language.none.fl_str_mv en
dc.relation.none.fl_str_mv International Journal of Power and Energy Systems
dc.rights.*.fl_str_mv info:eu-repo/semantics/openAccess
dc.title.none.fl_str_mv Benefit and risk analysis of an automatic meter reading system for electricité du Liban
dc.type.none.fl_str_mv Article
info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/article
description This paper summarizes the benefit and risk analysis of a study for modernizing the electricity metering, billing and revenue collection systems for ´Electricit´e du Liban, the national power company of Lebanon. A cost/benefit analysis of the modernized system shows that the system has a payback period of 3.05 years. Like all economic evaluations, there are uncertainties associated with the estimated costs and benefits which could increase the value of the payback period. The purpose of this paper is to identify the im- portant risks and other uncertainties that could affect the economic feasibility of the project and assess the potential impacts of these uncertainties. To achieve this objective, a Monte-Carlo type analysis is employed and a distribution of the expected payback period is determined. The benefits are modelled in two ways, using triangular and uniform distributions, while the costs are modelled using uni- form distributions only. The choice of triangular distribution shows confidence in the initial estimates whereas using a uniform distri- bution implies that the variables could deviate substantially from the initial estimates. The payback period determined from both models is around 3 years (3.18 years when all input variables are modelled using uniform distributions, and 3.12 years when uniform distributions are used for costs and triangular distributions are used for benefits) with a maximum range of 2.2–4.7 years. The results of the risk analysis also indicate that the benefits from an aggressive revenue recovery process (identifying and reducing fraud and theft) have the most influence on reducing the project payback period. In summary, this paper shows that the proposed modernization project is economically feasible.
eu_rights_str_mv openAccess
format article
id LAURepo_28f8d0cd725afe7a6df6053a9134e2af
identifier_str_mv 1710-2243
10.2316/Journal.203.2012.1.203-3654
Ghajar, R. F. (2012). Benefit and Risk Analysis of an Automatic Meter Reading System for Électricité du Liban. International Journal of Power and Energy Systems, 32(1), 1.
language_invalid_str_mv en
network_acronym_str LAURepo
network_name_str Lebanese American University repository
oai_identifier_str oai:laur.lau.edu.lb:10725/5557
publishDate 2012
repository.mail.fl_str_mv
repository.name.fl_str_mv
repository_id_str
spelling Benefit and risk analysis of an automatic meter reading system for electricité du LibanGhajar, Raymond F.This paper summarizes the benefit and risk analysis of a study for modernizing the electricity metering, billing and revenue collection systems for ´Electricit´e du Liban, the national power company of Lebanon. A cost/benefit analysis of the modernized system shows that the system has a payback period of 3.05 years. Like all economic evaluations, there are uncertainties associated with the estimated costs and benefits which could increase the value of the payback period. The purpose of this paper is to identify the im- portant risks and other uncertainties that could affect the economic feasibility of the project and assess the potential impacts of these uncertainties. To achieve this objective, a Monte-Carlo type analysis is employed and a distribution of the expected payback period is determined. The benefits are modelled in two ways, using triangular and uniform distributions, while the costs are modelled using uni- form distributions only. The choice of triangular distribution shows confidence in the initial estimates whereas using a uniform distri- bution implies that the variables could deviate substantially from the initial estimates. The payback period determined from both models is around 3 years (3.18 years when all input variables are modelled using uniform distributions, and 3.12 years when uniform distributions are used for costs and triangular distributions are used for benefits) with a maximum range of 2.2–4.7 years. The results of the risk analysis also indicate that the benefits from an aggressive revenue recovery process (identifying and reducing fraud and theft) have the most influence on reducing the project payback period. In summary, this paper shows that the proposed modernization project is economically feasible.PublishedN/A2017-04-28T08:25:23Z2017-04-28T08:25:23Z20122017-04-28Articleinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/article1710-2243http://hdl.handle.net/10725/555710.2316/Journal.203.2012.1.203-3654Ghajar, R. F. (2012). Benefit and Risk Analysis of an Automatic Meter Reading System for Électricité du Liban. International Journal of Power and Energy Systems, 32(1), 1.http://libraries.lau.edu.lb/research/laur/terms-of-use/articles.phphttp://www.actapress.com/Abstract.aspx?paperId=42765enInternational Journal of Power and Energy Systemsinfo:eu-repo/semantics/openAccessoai:laur.lau.edu.lb:10725/55572021-03-19T10:00:51Z
spellingShingle Benefit and risk analysis of an automatic meter reading system for electricité du Liban
Ghajar, Raymond F.
status_str publishedVersion
title Benefit and risk analysis of an automatic meter reading system for electricité du Liban
title_full Benefit and risk analysis of an automatic meter reading system for electricité du Liban
title_fullStr Benefit and risk analysis of an automatic meter reading system for electricité du Liban
title_full_unstemmed Benefit and risk analysis of an automatic meter reading system for electricité du Liban
title_short Benefit and risk analysis of an automatic meter reading system for electricité du Liban
title_sort Benefit and risk analysis of an automatic meter reading system for electricité du Liban
url http://hdl.handle.net/10725/5557
http://libraries.lau.edu.lb/research/laur/terms-of-use/articles.php
http://www.actapress.com/Abstract.aspx?paperId=42765