Activity-level space scheduling
Activity-level space scheduling involves allocating site space over time to static and dynamic construction resources such as robots. The resulting coarse layouts pertaining to activity-related time intervals serve to coordinate the motion planning of multiple robots. This cannot be done with existi...
Saved in:
| Main Author: | Zouein, Pierrette P. (author) |
|---|---|
| Other Authors: | Tommelein, Iris D. (author) |
| Format: | conferenceObject |
| Published: |
1992
|
| Online Access: | http://hdl.handle.net/10725/8635 http://libraries.lau.edu.lb/research/laur/terms-of-use/articles.php http://www.iaarc.org/publications/fulltext/Activity-level_space_scheduling.PDF |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Space schedule construction
by: Zouein, Pierrette P.
Published: (1993) -
Time-space tradeoff strategies for space-schedule construction
by: Zouein, Pierrette P.
Published: (2017) -
Improvement Algorithm for Limited Space Scheduling
by: Zouein, Pierrette
Published: (2001) -
Space scheduling for construction progress planning and control
by: Zouein, P.P.
Published: (1993) -
Space-time characterization for resource management on construction sites
by: Zouein, Pierrette P.
Published: (2017)