Exchanging layout and schedule data in a real-time distributed environment
Unpredictable site conditions and unforeseen changes in construction work may result in inefficiencies due to a shortage of work space and difficult access to critical areas on site. This hampers productivity. Detailed advance planning of site space use over time and reorganization of the work may a...
Saved in:
| Main Author: | Zouein, P. (author) |
|---|---|
| Other Authors: | Tommelein, Iris D. (author), Dzeng, Ren-Jye (author) |
| Format: | conferenceObject |
| Published: |
2017
|
| Online Access: | http://hdl.handle.net/10725/6040 http://libraries.lau.edu.lb/research/laur/terms-of-use/articles.php http://cedb.asce.org/CEDBsearch/record.jsp?dockey=0082206 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Automating dynamic layout construction
by: Zouein, P.P.
Published: (2017) -
Storage yard layout at container terminals
by: Zouein, P.
Published: (2017) -
A parallel genetic algorithm for the geometrically constrained site layout problem
by: Zouein, P.
Published: (2018) -
An evolutionary algorithm for solving the geometrically constrained site layout problem
by: Zouein, P.
Published: (2017) -
Genetic Algorithm for Solving Site Layout Problem with Unequal-Size and Constrained Facilities
by: Zouein, P. P.
Published: (2002)