Simulating and comparing various price-driven bid selection methods from an owner's perspective. (c2017)
In the construction industry, it is crucial for owners to select the appropriate contract delivery method in order to achieve best performance on their projects. The low bid method has been the most common competitive bid selection approach used for public projects in the U.S. construction industry...
محفوظ في:
| المؤلف الرئيسي: | Ammoury, Michael Fayez (author) |
|---|---|
| التنسيق: | masterThesis |
| منشور في: |
2017
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | http://hdl.handle.net/10725/7189 https://doi.org/10.26756/th.2018.40 http://libraries.lau.edu.lb/research/laur/terms-of-use/thesis.php |
| الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Modeling of tri-parameter contracts integrating cost, time and risk
حسب: Rabie, Mohamad M.
منشور في: (2014) -
An illusion of freedom. (c2017)
حسب: Hashem, Farrah AL
منشور في: (2017) -
Mapping corruption in public roads construction in Lebanon. (c2019)
حسب: Saba, Rami Elias
منشور في: (2019) -
Unilateral Termination of Construction Contract - A Comparative Study between Chinese Law and UAE Law
حسب: Yin, Zhe
منشور في: (2015) -
Construction Contract Administration Performance Assessment Tool by Using a Fuzzy Structural Equation Model
حسب: Murat Gunduz (16875960)
منشور في: (2020)