The second low bid method
The low bid method has been the most common competitive bid selection approach used for public projects in the U.S. construction industry and worldwide. This method is usually coupled with a prequalification process to ensure that the lowest bidder has the financial capacity, the necessary experienc...
Saved in:
| Main Author: | Awwad, Rita (author) |
|---|---|
| Other Authors: | Ioannou, Photios (author) |
| Format: | conferenceObject |
| Published: |
2017
|
| Online Access: | http://hdl.handle.net/10725/5626 http://libraries.lau.edu.lb/research/laur/terms-of-use/articles.php http://itc.scix.net/data/works/att/w78-2012-Paper-86.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Below-Average Bidding Method
by: Awwad, Rita E.
Published: (2010) -
Study of less than average bid method
by: Awwad, Rita E.
Published: (2017) -
Neutral and risk-sensitive models for competitive bidding methods based on average and order statistics
by: Awwad, Rita Elias
Published: (2010) -
Evolutionary Simulation of Contractors’ Learning and Behavior under Two Bid-Tendering Approaches
by: Awwad, Rita
Published: (2016) -
Developing a Virtual Laboratory for Construction Bidding Environment Using Agent-Based Modeling
by: Awwad, Rita
Published: (2015)