Space schedule construction

The layout of temporary facilities on a construction site is affected by changes in a construction schedule, including changes in activity duration, resource selection, and resource allocation levels. Conversely, changes in schedule may be enforced by limited space availability and site access. Such...

وصف كامل

محفوظ في:
التفاصيل البيبلوغرافية
المؤلف الرئيسي: Zouein, Pierrette P. (author)
التنسيق: conferenceObject
منشور في: 1993
الوصول للمادة أونلاين:http://hdl.handle.net/10725/8632
http://libraries.lau.edu.lb/research/laur/terms-of-use/articles.php
http://cedb.asce.org/CEDBsearch/record.jsp?dockey=0082320
الوسوم: إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
_version_ 1864513485360070656
author Zouein, Pierrette P.
author_facet Zouein, Pierrette P.
author_role author
dc.creator.none.fl_str_mv Zouein, Pierrette P.
dc.date.none.fl_str_mv 1993
2018-10-15T11:00:20Z
2018-10-15T11:00:20Z
2018-10-15
dc.identifier.none.fl_str_mv http://hdl.handle.net/10725/8632
Zouein, P. P., & Tommelein, I. D. (1993). Space schedule construction. In Computing in civil and building engineering (pp. 1770-1777). ASCE.
http://libraries.lau.edu.lb/research/laur/terms-of-use/articles.php
http://cedb.asce.org/CEDBsearch/record.jsp?dockey=0082320
dc.language.none.fl_str_mv en
dc.rights.*.fl_str_mv info:eu-repo/semantics/openAccess
dc.title.none.fl_str_mv Space schedule construction
dc.type.none.fl_str_mv Conference Paper / Proceeding
info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/conferenceObject
description The layout of temporary facilities on a construction site is affected by changes in a construction schedule, including changes in activity duration, resource selection, and resource allocation levels. Conversely, changes in schedule may be enforced by limited space availability and site access. Such a bi-directional interaction between activity scheduling and layout construction defines the space scheduling task. This task is addressed by the MoveSchedule model that uses a partially automated heuristic solution procedure. MoveSchedule's conceptual design is presented here. The procedure constructs an activity schedule that satisfies spatial site constraints at any given time while keeping the project duration minimal, and resolves spatial conflicts by making space-time tradeoffs. Spatial conflicts are identified by the user who constructs the sequence of layouts spanning the entire project. An interactive layout construction interface, termed MovePlan, is used as a support tool to construct these layouts. The resulting model addresses some key aspects of the extremely complex space scheduling problem.
eu_rights_str_mv openAccess
format conferenceObject
id LAURepo_6e2e6fc5ced900209bf66845907ca38e
identifier_str_mv Zouein, P. P., & Tommelein, I. D. (1993). Space schedule construction. In Computing in civil and building engineering (pp. 1770-1777). ASCE.
language_invalid_str_mv en
network_acronym_str LAURepo
network_name_str Lebanese American University repository
oai_identifier_str oai:laur.lau.edu.lb:10725/8632
publishDate 1993
repository.mail.fl_str_mv
repository.name.fl_str_mv
repository_id_str
spelling Space schedule constructionZouein, Pierrette P.The layout of temporary facilities on a construction site is affected by changes in a construction schedule, including changes in activity duration, resource selection, and resource allocation levels. Conversely, changes in schedule may be enforced by limited space availability and site access. Such a bi-directional interaction between activity scheduling and layout construction defines the space scheduling task. This task is addressed by the MoveSchedule model that uses a partially automated heuristic solution procedure. MoveSchedule's conceptual design is presented here. The procedure constructs an activity schedule that satisfies spatial site constraints at any given time while keeping the project duration minimal, and resolves spatial conflicts by making space-time tradeoffs. Spatial conflicts are identified by the user who constructs the sequence of layouts spanning the entire project. An interactive layout construction interface, termed MovePlan, is used as a support tool to construct these layouts. The resulting model addresses some key aspects of the extremely complex space scheduling problem.N/A2018-10-15T11:00:20Z2018-10-15T11:00:20Z19932018-10-15Conference Paper / Proceedinginfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/conferenceObjecthttp://hdl.handle.net/10725/8632Zouein, P. P., & Tommelein, I. D. (1993). Space schedule construction. In Computing in civil and building engineering (pp. 1770-1777). ASCE.http://libraries.lau.edu.lb/research/laur/terms-of-use/articles.phphttp://cedb.asce.org/CEDBsearch/record.jsp?dockey=0082320eninfo:eu-repo/semantics/openAccessoai:laur.lau.edu.lb:10725/86322021-03-19T10:45:18Z
spellingShingle Space schedule construction
Zouein, Pierrette P.
status_str publishedVersion
title Space schedule construction
title_full Space schedule construction
title_fullStr Space schedule construction
title_full_unstemmed Space schedule construction
title_short Space schedule construction
title_sort Space schedule construction
url http://hdl.handle.net/10725/8632
http://libraries.lau.edu.lb/research/laur/terms-of-use/articles.php
http://cedb.asce.org/CEDBsearch/record.jsp?dockey=0082320