Project performance rating model for water and wastewater treatment plant public projects
Water and wastewater construction capital projects are distinctive, highly complex and do not currently have well-established overall performance rating models to assess their projects’ successes. Project performance used for gauging the overall success of project delivery is a complex concept that...
محفوظ في:
| المؤلف الرئيسي: | |
|---|---|
| مؤلفون آخرون: | , |
| التنسيق: | article |
| منشور في: |
2018
|
| الوصول للمادة أونلاين: | http://hdl.handle.net/10725/11173 https://doi.org/10.1061/ (ASCE)ME.1943-5479.0000678 http://libraries.lau.edu.lb/research/laur/terms-of-use/articles.php https://ascelibrary.org/doi/pdf/10.1061/%28ASCE%29ME.1943-5479.0000678 |
| الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
| _version_ | 1864513488333832192 |
|---|---|
| author | Abi Shdid, Caesar |
| author2 | Andary, Elie Chowdhury, Arindam Gan |
| author2_role | author author |
| author_facet | Abi Shdid, Caesar Andary, Elie Chowdhury, Arindam Gan |
| author_role | author |
| dc.creator.none.fl_str_mv | Abi Shdid, Caesar Andary, Elie Chowdhury, Arindam Gan |
| dc.date.none.fl_str_mv | 2018 2019-07-30T09:55:00Z 2019-07-30T09:55:00Z 2019-07-30 |
| dc.identifier.none.fl_str_mv | 1943-5479 http://hdl.handle.net/10725/11173 https://doi.org/10.1061/ (ASCE)ME.1943-5479.0000678 Abi Shdid, C., Andary, E., Gan Chowdhury, A., & Ahmad, I. U. (2018). Project Performance Rating Model for Water and Wastewater Treatment Plant Public Projects. Journal of Management in Engineering, 35(2), 04018064. http://libraries.lau.edu.lb/research/laur/terms-of-use/articles.php https://ascelibrary.org/doi/pdf/10.1061/%28ASCE%29ME.1943-5479.0000678 |
| dc.language.none.fl_str_mv | en |
| dc.relation.none.fl_str_mv | Journal of Management in Engineering |
| dc.rights.*.fl_str_mv | info:eu-repo/semantics/openAccess |
| dc.title.none.fl_str_mv | Project performance rating model for water and wastewater treatment plant public projects |
| dc.type.none.fl_str_mv | Article info:eu-repo/semantics/publishedVersion info:eu-repo/semantics/article |
| description | Water and wastewater construction capital projects are distinctive, highly complex and do not currently have well-established overall performance rating models to assess their projects’ successes. Project performance used for gauging the overall success of project delivery is a complex concept that cannot be measured by one factor. It involves several criteria with many factors that need to be accounted for. Data from 43 water and wastewater projects delivered using the traditional design-bid-build (DBB) delivery method is collected to form a dataset that is utilized to build a project performance rating (PPR) model. The developed PPR model combines the key performance factors of a project into one performance index (PI). The PPR model is tested on a controlled case study project delivered by infusing certain integrated project delivery (IPD) principles into the DBB delivery method. The PPR model showed the implementation of the IPD principles to improve the performance of the case study project by a factor of 1.3. The developed model is a tool that helps utility owners compare the performance of various projects while getting a detailed insight into critical problem areas that are likely to impact performance rating. |
| eu_rights_str_mv | openAccess |
| format | article |
| id | LAURepo_76f90cd23544f7dcd33f02f360139a35 |
| identifier_str_mv | 1943-5479 Abi Shdid, C., Andary, E., Gan Chowdhury, A., & Ahmad, I. U. (2018). Project Performance Rating Model for Water and Wastewater Treatment Plant Public Projects. Journal of Management in Engineering, 35(2), 04018064. |
| language_invalid_str_mv | en |
| network_acronym_str | LAURepo |
| network_name_str | Lebanese American University repository |
| oai_identifier_str | oai:laur.lau.edu.lb:10725/11173 |
| publishDate | 2018 |
| repository.mail.fl_str_mv | |
| repository.name.fl_str_mv | |
| repository_id_str | |
| spelling | Project performance rating model for water and wastewater treatment plant public projectsAbi Shdid, CaesarAndary, ElieChowdhury, Arindam GanWater and wastewater construction capital projects are distinctive, highly complex and do not currently have well-established overall performance rating models to assess their projects’ successes. Project performance used for gauging the overall success of project delivery is a complex concept that cannot be measured by one factor. It involves several criteria with many factors that need to be accounted for. Data from 43 water and wastewater projects delivered using the traditional design-bid-build (DBB) delivery method is collected to form a dataset that is utilized to build a project performance rating (PPR) model. The developed PPR model combines the key performance factors of a project into one performance index (PI). The PPR model is tested on a controlled case study project delivered by infusing certain integrated project delivery (IPD) principles into the DBB delivery method. The PPR model showed the implementation of the IPD principles to improve the performance of the case study project by a factor of 1.3. The developed model is a tool that helps utility owners compare the performance of various projects while getting a detailed insight into critical problem areas that are likely to impact performance rating.PublishedN/A2019-07-30T09:55:00Z2019-07-30T09:55:00Z20182019-07-30Articleinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/article1943-5479http://hdl.handle.net/10725/11173https://doi.org/10.1061/ (ASCE)ME.1943-5479.0000678Abi Shdid, C., Andary, E., Gan Chowdhury, A., & Ahmad, I. U. (2018). Project Performance Rating Model for Water and Wastewater Treatment Plant Public Projects. Journal of Management in Engineering, 35(2), 04018064.http://libraries.lau.edu.lb/research/laur/terms-of-use/articles.phphttps://ascelibrary.org/doi/pdf/10.1061/%28ASCE%29ME.1943-5479.0000678enJournal of Management in Engineeringinfo:eu-repo/semantics/openAccessoai:laur.lau.edu.lb:10725/111732021-03-19T10:47:36Z |
| spellingShingle | Project performance rating model for water and wastewater treatment plant public projects Abi Shdid, Caesar |
| status_str | publishedVersion |
| title | Project performance rating model for water and wastewater treatment plant public projects |
| title_full | Project performance rating model for water and wastewater treatment plant public projects |
| title_fullStr | Project performance rating model for water and wastewater treatment plant public projects |
| title_full_unstemmed | Project performance rating model for water and wastewater treatment plant public projects |
| title_short | Project performance rating model for water and wastewater treatment plant public projects |
| title_sort | Project performance rating model for water and wastewater treatment plant public projects |
| url | http://hdl.handle.net/10725/11173 https://doi.org/10.1061/ (ASCE)ME.1943-5479.0000678 http://libraries.lau.edu.lb/research/laur/terms-of-use/articles.php https://ascelibrary.org/doi/pdf/10.1061/%28ASCE%29ME.1943-5479.0000678 |