Project performance rating model for water and wastewater treatment plant public projects

Water and wastewater construction capital projects are distinctive, highly complex and do not currently have well-established overall performance rating models to assess their projects’ successes. Project performance used for gauging the overall success of project delivery is a complex concept that...

وصف كامل

محفوظ في:
التفاصيل البيبلوغرافية
المؤلف الرئيسي: Abi Shdid, Caesar (author)
مؤلفون آخرون: Andary, Elie (author), Chowdhury, Arindam Gan (author)
التنسيق: article
منشور في: 2018
الوصول للمادة أونلاين:http://hdl.handle.net/10725/11173
https://doi.org/10.1061/ (ASCE)ME.1943-5479.0000678
http://libraries.lau.edu.lb/research/laur/terms-of-use/articles.php
https://ascelibrary.org/doi/pdf/10.1061/%28ASCE%29ME.1943-5479.0000678
الوسوم: إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
_version_ 1864513488333832192
author Abi Shdid, Caesar
author2 Andary, Elie
Chowdhury, Arindam Gan
author2_role author
author
author_facet Abi Shdid, Caesar
Andary, Elie
Chowdhury, Arindam Gan
author_role author
dc.creator.none.fl_str_mv Abi Shdid, Caesar
Andary, Elie
Chowdhury, Arindam Gan
dc.date.none.fl_str_mv 2018
2019-07-30T09:55:00Z
2019-07-30T09:55:00Z
2019-07-30
dc.identifier.none.fl_str_mv 1943-5479
http://hdl.handle.net/10725/11173
https://doi.org/10.1061/ (ASCE)ME.1943-5479.0000678
Abi Shdid, C., Andary, E., Gan Chowdhury, A., & Ahmad, I. U. (2018). Project Performance Rating Model for Water and Wastewater Treatment Plant Public Projects. Journal of Management in Engineering, 35(2), 04018064.
http://libraries.lau.edu.lb/research/laur/terms-of-use/articles.php
https://ascelibrary.org/doi/pdf/10.1061/%28ASCE%29ME.1943-5479.0000678
dc.language.none.fl_str_mv en
dc.relation.none.fl_str_mv Journal of Management in Engineering
dc.rights.*.fl_str_mv info:eu-repo/semantics/openAccess
dc.title.none.fl_str_mv Project performance rating model for water and wastewater treatment plant public projects
dc.type.none.fl_str_mv Article
info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/article
description Water and wastewater construction capital projects are distinctive, highly complex and do not currently have well-established overall performance rating models to assess their projects’ successes. Project performance used for gauging the overall success of project delivery is a complex concept that cannot be measured by one factor. It involves several criteria with many factors that need to be accounted for. Data from 43 water and wastewater projects delivered using the traditional design-bid-build (DBB) delivery method is collected to form a dataset that is utilized to build a project performance rating (PPR) model. The developed PPR model combines the key performance factors of a project into one performance index (PI). The PPR model is tested on a controlled case study project delivered by infusing certain integrated project delivery (IPD) principles into the DBB delivery method. The PPR model showed the implementation of the IPD principles to improve the performance of the case study project by a factor of 1.3. The developed model is a tool that helps utility owners compare the performance of various projects while getting a detailed insight into critical problem areas that are likely to impact performance rating.
eu_rights_str_mv openAccess
format article
id LAURepo_76f90cd23544f7dcd33f02f360139a35
identifier_str_mv 1943-5479
Abi Shdid, C., Andary, E., Gan Chowdhury, A., & Ahmad, I. U. (2018). Project Performance Rating Model for Water and Wastewater Treatment Plant Public Projects. Journal of Management in Engineering, 35(2), 04018064.
language_invalid_str_mv en
network_acronym_str LAURepo
network_name_str Lebanese American University repository
oai_identifier_str oai:laur.lau.edu.lb:10725/11173
publishDate 2018
repository.mail.fl_str_mv
repository.name.fl_str_mv
repository_id_str
spelling Project performance rating model for water and wastewater treatment plant public projectsAbi Shdid, CaesarAndary, ElieChowdhury, Arindam GanWater and wastewater construction capital projects are distinctive, highly complex and do not currently have well-established overall performance rating models to assess their projects’ successes. Project performance used for gauging the overall success of project delivery is a complex concept that cannot be measured by one factor. It involves several criteria with many factors that need to be accounted for. Data from 43 water and wastewater projects delivered using the traditional design-bid-build (DBB) delivery method is collected to form a dataset that is utilized to build a project performance rating (PPR) model. The developed PPR model combines the key performance factors of a project into one performance index (PI). The PPR model is tested on a controlled case study project delivered by infusing certain integrated project delivery (IPD) principles into the DBB delivery method. The PPR model showed the implementation of the IPD principles to improve the performance of the case study project by a factor of 1.3. The developed model is a tool that helps utility owners compare the performance of various projects while getting a detailed insight into critical problem areas that are likely to impact performance rating.PublishedN/A2019-07-30T09:55:00Z2019-07-30T09:55:00Z20182019-07-30Articleinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/article1943-5479http://hdl.handle.net/10725/11173https://doi.org/10.1061/ (ASCE)ME.1943-5479.0000678Abi Shdid, C., Andary, E., Gan Chowdhury, A., & Ahmad, I. U. (2018). Project Performance Rating Model for Water and Wastewater Treatment Plant Public Projects. Journal of Management in Engineering, 35(2), 04018064.http://libraries.lau.edu.lb/research/laur/terms-of-use/articles.phphttps://ascelibrary.org/doi/pdf/10.1061/%28ASCE%29ME.1943-5479.0000678enJournal of Management in Engineeringinfo:eu-repo/semantics/openAccessoai:laur.lau.edu.lb:10725/111732021-03-19T10:47:36Z
spellingShingle Project performance rating model for water and wastewater treatment plant public projects
Abi Shdid, Caesar
status_str publishedVersion
title Project performance rating model for water and wastewater treatment plant public projects
title_full Project performance rating model for water and wastewater treatment plant public projects
title_fullStr Project performance rating model for water and wastewater treatment plant public projects
title_full_unstemmed Project performance rating model for water and wastewater treatment plant public projects
title_short Project performance rating model for water and wastewater treatment plant public projects
title_sort Project performance rating model for water and wastewater treatment plant public projects
url http://hdl.handle.net/10725/11173
https://doi.org/10.1061/ (ASCE)ME.1943-5479.0000678
http://libraries.lau.edu.lb/research/laur/terms-of-use/articles.php
https://ascelibrary.org/doi/pdf/10.1061/%28ASCE%29ME.1943-5479.0000678