Improvement Algorithm for Limited Space Scheduling
Selecting construction methods, scheduling activities, and planning the use of site space are key to constructing a project efficiently. Site layout and activity scheduling have been tackled as independent problems. Their interdependence is often ignored at the planning stage and may be dealt with—i...
Saved in:
| Main Author: | Zouein, Pierrette (author) |
|---|---|
| Other Authors: | Tommelein, I. (author) |
| Format: | article |
| Published: |
2001
|
| Online Access: | http://hdl.handle.net/10725/3120 http://dx.doi.org/10.1061/(ASCE)0733-9364(2001)127:2(116) |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Space schedule construction
by: Zouein, Pierrette P.
Published: (1993) -
Activity-level space scheduling
by: Zouein, Pierrette P.
Published: (1992) -
Time-space tradeoff strategies for space-schedule construction
by: Zouein, Pierrette P.
Published: (2017) -
Space scheduling for construction progress planning and control
by: Zouein, P.P.
Published: (1993) -
Space-time characterization for resource management on construction sites
by: Zouein, Pierrette P.
Published: (2017)