Space scheduling for construction progress planning and control

Space scheduling pertains to allocating the work space to resources associated which activates in a schedule as it changes over time. This is an important aspect of materials management in dynamic environments in which many pieces of equipment, crews, and possibly robots move about, as congestion an...

وصف كامل

محفوظ في:
التفاصيل البيبلوغرافية
المؤلف الرئيسي: Zouein, P.P. (author)
مؤلفون آخرون: Tommelien, I.D. (author)
التنسيق: conferenceObject
منشور في: 1993
الوصول للمادة أونلاين:http://hdl.handle.net/10725/8634
https://doi.org/10.22260/ISARC1993/0054
http://libraries.lau.edu.lb/research/laur/terms-of-use/articles.php
https://pdfs.semanticscholar.org/2d9d/3272467c67f0ce3b141c5f94ee84179d577e.pdf
الوسوم: إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
_version_ 1864513485361119232
author Zouein, P.P.
author2 Tommelien, I.D.
author2_role author
author_facet Zouein, P.P.
Tommelien, I.D.
author_role author
dc.creator.none.fl_str_mv Zouein, P.P.
Tommelien, I.D.
dc.date.none.fl_str_mv 1993
2018-10-15T11:59:09Z
2018-10-15T11:59:09Z
2018-10-15
dc.identifier.none.fl_str_mv http://hdl.handle.net/10725/8634
https://doi.org/10.22260/ISARC1993/0054
Tommelein, I. D., & Zouein, P. P. (1993). Space scheduling for construction progress planning and control. In Proc., 10th Int. Symp. on Automation and Robotics in Construction (pp. 415-422).
http://libraries.lau.edu.lb/research/laur/terms-of-use/articles.php
https://pdfs.semanticscholar.org/2d9d/3272467c67f0ce3b141c5f94ee84179d577e.pdf
dc.language.none.fl_str_mv en
dc.rights.*.fl_str_mv info:eu-repo/semantics/openAccess
dc.title.none.fl_str_mv Space scheduling for construction progress planning and control
dc.type.none.fl_str_mv Conference Paper / Proceeding
info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/conferenceObject
description Space scheduling pertains to allocating the work space to resources associated which activates in a schedule as it changes over time. This is an important aspect of materials management in dynamic environments in which many pieces of equipment, crews, and possibly robots move about, as congestion and interference would seriously hamper production. Advanced space scheduling is then warranted to reduce the need of real time sensing and adjusting. Reactive space scheduling may be needed when problems have arisen and must be alleviated. In any case, space-schedule data must be made available in a timely fashion to all parties who need it. The MovePlan model for dynamic layout planning is described to illustrate the overall significance of space scheduling to construction progress planning. MovePlan uses a two -dimensional representation of space to keep the computational costs associated with space time calculations low. Accordingly, the model does not require a powerful work station, but runs on a laptop computer-and is expected to run on a palm top-that could be easily taken out into the field. MovePlan has been loosely integrated with a space schedule conflict resolver, named ConRes, which delays activities or changes their resource needs to lower the demand in space so-called problematic time intervals. Issues pertaining to data collection for space scheduling, scheduling progress control, and data dissemination are discussed. A futuristic scenario is presented to illustrate the use of palmtop computing for space scheduling on site.
eu_rights_str_mv openAccess
format conferenceObject
id LAURepo_a25b4b27354be3a19d60d900fbfa2c1e
identifier_str_mv Tommelein, I. D., & Zouein, P. P. (1993). Space scheduling for construction progress planning and control. In Proc., 10th Int. Symp. on Automation and Robotics in Construction (pp. 415-422).
language_invalid_str_mv en
network_acronym_str LAURepo
network_name_str Lebanese American University repository
oai_identifier_str oai:laur.lau.edu.lb:10725/8634
publishDate 1993
repository.mail.fl_str_mv
repository.name.fl_str_mv
repository_id_str
spelling Space scheduling for construction progress planning and controlZouein, P.P.Tommelien, I.D.Space scheduling pertains to allocating the work space to resources associated which activates in a schedule as it changes over time. This is an important aspect of materials management in dynamic environments in which many pieces of equipment, crews, and possibly robots move about, as congestion and interference would seriously hamper production. Advanced space scheduling is then warranted to reduce the need of real time sensing and adjusting. Reactive space scheduling may be needed when problems have arisen and must be alleviated. In any case, space-schedule data must be made available in a timely fashion to all parties who need it. The MovePlan model for dynamic layout planning is described to illustrate the overall significance of space scheduling to construction progress planning. MovePlan uses a two -dimensional representation of space to keep the computational costs associated with space time calculations low. Accordingly, the model does not require a powerful work station, but runs on a laptop computer-and is expected to run on a palm top-that could be easily taken out into the field. MovePlan has been loosely integrated with a space schedule conflict resolver, named ConRes, which delays activities or changes their resource needs to lower the demand in space so-called problematic time intervals. Issues pertaining to data collection for space scheduling, scheduling progress control, and data dissemination are discussed. A futuristic scenario is presented to illustrate the use of palmtop computing for space scheduling on site.N/A2018-10-15T11:59:09Z2018-10-15T11:59:09Z19932018-10-15Conference Paper / Proceedinginfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/conferenceObjecthttp://hdl.handle.net/10725/8634https://doi.org/10.22260/ISARC1993/0054Tommelein, I. D., & Zouein, P. P. (1993). Space scheduling for construction progress planning and control. In Proc., 10th Int. Symp. on Automation and Robotics in Construction (pp. 415-422).http://libraries.lau.edu.lb/research/laur/terms-of-use/articles.phphttps://pdfs.semanticscholar.org/2d9d/3272467c67f0ce3b141c5f94ee84179d577e.pdfeninfo:eu-repo/semantics/openAccessoai:laur.lau.edu.lb:10725/86342021-03-19T10:45:23Z
spellingShingle Space scheduling for construction progress planning and control
Zouein, P.P.
status_str publishedVersion
title Space scheduling for construction progress planning and control
title_full Space scheduling for construction progress planning and control
title_fullStr Space scheduling for construction progress planning and control
title_full_unstemmed Space scheduling for construction progress planning and control
title_short Space scheduling for construction progress planning and control
title_sort Space scheduling for construction progress planning and control
url http://hdl.handle.net/10725/8634
https://doi.org/10.22260/ISARC1993/0054
http://libraries.lau.edu.lb/research/laur/terms-of-use/articles.php
https://pdfs.semanticscholar.org/2d9d/3272467c67f0ce3b141c5f94ee84179d577e.pdf