MoveSchedule
Site layout planning is crucial for enhancing the overall efficiency of construction operations and for reducing materials (re)location costs. More importantly, it helps identify construction time periods with potential spatial conflicts due to limited space so that they can be avoided in early proj...
Saved in:
| Main Author: | Zouein, Pierette (author) |
|---|---|
| Format: | masterThesis |
| Published: |
1995
|
| Online Access: | http://hdl.handle.net/10725/8475 http://libraries.lau.edu.lb/research/laur/terms-of-use/thesis.php https://search.proquest.com/pqdtglobal/docview/304214984/abstract/BAA1BEC88FBE4FD4PQ/1?accountid=27870 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Design constructability and space management
by: Zouein, Pierette
Published: (2018) -
A Parallel Genetic Algorithm for the Open-Shop Scheduling Problem Using Deterministic and Random Moves
by: Harmanani, Haidar M.
Published: (2016) -
Space schedule construction
by: Zouein, Pierrette P.
Published: (1993) -
Improvement Algorithm for Limited Space Scheduling
by: Zouein, Pierrette
Published: (2001) -
Activity-level space scheduling
by: Zouein, Pierrette P.
Published: (1992)