An efficient claim management assurance system using EPC contract based on improved monarch butterfly optimization models

<p dir="ltr">The Engineering Procurement Construction (EPC) contract systems are widely employed in the construction industry. Among the prevalent issues in this sector, cash flow problems frequently lead to decreased productivity and efficiency. To address these challenges, a claim...

وصف كامل

محفوظ في:
التفاصيل البيبلوغرافية
المؤلف الرئيسي: K. Mukilan (22224793) (author)
مؤلفون آخرون: C. Rameshbabu (22224796) (author), B. Baranitharan (22224799) (author), Suresh Muthusamy (11866462) (author), Ponarun Ramamoorthi (17792564) (author), Kishor Kumar Sadasivuni (8036039) (author), Kamil Oflaz (21841958) (author), Anish Khan (560584) (author)
منشور في: 2024
الموضوعات:
الوسوم: إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
_version_ 1864513540057989120
author K. Mukilan (22224793)
author2 C. Rameshbabu (22224796)
B. Baranitharan (22224799)
Suresh Muthusamy (11866462)
Ponarun Ramamoorthi (17792564)
Kishor Kumar Sadasivuni (8036039)
Kamil Oflaz (21841958)
Anish Khan (560584)
author2_role author
author
author
author
author
author
author
author_facet K. Mukilan (22224793)
C. Rameshbabu (22224796)
B. Baranitharan (22224799)
Suresh Muthusamy (11866462)
Ponarun Ramamoorthi (17792564)
Kishor Kumar Sadasivuni (8036039)
Kamil Oflaz (21841958)
Anish Khan (560584)
author_role author
dc.creator.none.fl_str_mv K. Mukilan (22224793)
C. Rameshbabu (22224796)
B. Baranitharan (22224799)
Suresh Muthusamy (11866462)
Ponarun Ramamoorthi (17792564)
Kishor Kumar Sadasivuni (8036039)
Kamil Oflaz (21841958)
Anish Khan (560584)
dc.date.none.fl_str_mv 2024-11-18T09:00:00Z
dc.identifier.none.fl_str_mv 10.1007/s00521-024-10414-9
dc.relation.none.fl_str_mv https://figshare.com/articles/journal_contribution/An_efficient_claim_management_assurance_system_using_EPC_contract_based_on_improved_monarch_butterfly_optimization_models/30094642
dc.rights.none.fl_str_mv CC BY 4.0
info:eu-repo/semantics/openAccess
dc.subject.none.fl_str_mv Engineering
Manufacturing engineering
EPC
Claim management system
Improved monarch butterfly optimization
Risk analysis
Cost Quality
dc.title.none.fl_str_mv An efficient claim management assurance system using EPC contract based on improved monarch butterfly optimization models
dc.type.none.fl_str_mv Text
Journal contribution
info:eu-repo/semantics/publishedVersion
text
contribution to journal
description <p dir="ltr">The Engineering Procurement Construction (EPC) contract systems are widely employed in the construction industry. Among the prevalent issues in this sector, cash flow problems frequently lead to decreased productivity and efficiency. To address these challenges, a claim management system is developed based on the Improved Monarch Butterfly Optimization Algorithm (IMBOA) and the principles of EPC. Conventional construction models typically optimize only a single objective, such as time, cost, or delay, which may not effectively enhance overall performance. This study aims to develop a claim management system based on IMBOA and EPC principles to optimize multiple objectives, focusing on minimizing project costs and time delays while ensuring high-quality results. The basic methodology of this research involves integrating EPC and claim management principles with the IMBOA algorithm to create an efficient, high-quality system. This process starts with a comprehensive literature review on EPC, claims, MBOA, and related algorithms. Common disputes and claims in the construction industry are examined, and critical factors influencing these claims are identified. The Monarch Butterfly Optimization Algorithm (MBOA) and its improved version (IMBOA) are explored for their application in optimizing project performance. A case study in China's coal mining industry evaluates the effectiveness of the EPC approach, demonstrating that it minimizes time delays and costs. The IMBOA approach proposed in this study has the potential to mitigate 23% of risks and avoid 32% of risks associated with the action plan of China's coal mining industry. Furthermore, comparative analysis with other optimization models indicates that the developed IMBOA model yields superior results, reducing overall project time by 15% and cost by 18%.</p><h2>Other Information</h2><p dir="ltr">Published in: Neural Computing and Applications<br>License: <a href="https://creativecommons.org/licenses/by/4.0" target="_blank">https://creativecommons.org/licenses/by/4.0</a><br>See article on publisher's website: <a href="https://dx.doi.org/10.1007/s00521-024-10414-9" target="_blank">https://dx.doi.org/10.1007/s00521-024-10414-9</a></p>
eu_rights_str_mv openAccess
id Manara2_8b18811ffe8d619734044aa0744a9bff
identifier_str_mv 10.1007/s00521-024-10414-9
network_acronym_str Manara2
network_name_str Manara2
oai_identifier_str oai:figshare.com:article/30094642
publishDate 2024
repository.mail.fl_str_mv
repository.name.fl_str_mv
repository_id_str
rights_invalid_str_mv CC BY 4.0
spelling An efficient claim management assurance system using EPC contract based on improved monarch butterfly optimization modelsK. Mukilan (22224793)C. Rameshbabu (22224796)B. Baranitharan (22224799)Suresh Muthusamy (11866462)Ponarun Ramamoorthi (17792564)Kishor Kumar Sadasivuni (8036039)Kamil Oflaz (21841958)Anish Khan (560584)EngineeringManufacturing engineeringEPCClaim management systemImproved monarch butterfly optimizationRisk analysisCost Quality<p dir="ltr">The Engineering Procurement Construction (EPC) contract systems are widely employed in the construction industry. Among the prevalent issues in this sector, cash flow problems frequently lead to decreased productivity and efficiency. To address these challenges, a claim management system is developed based on the Improved Monarch Butterfly Optimization Algorithm (IMBOA) and the principles of EPC. Conventional construction models typically optimize only a single objective, such as time, cost, or delay, which may not effectively enhance overall performance. This study aims to develop a claim management system based on IMBOA and EPC principles to optimize multiple objectives, focusing on minimizing project costs and time delays while ensuring high-quality results. The basic methodology of this research involves integrating EPC and claim management principles with the IMBOA algorithm to create an efficient, high-quality system. This process starts with a comprehensive literature review on EPC, claims, MBOA, and related algorithms. Common disputes and claims in the construction industry are examined, and critical factors influencing these claims are identified. The Monarch Butterfly Optimization Algorithm (MBOA) and its improved version (IMBOA) are explored for their application in optimizing project performance. A case study in China's coal mining industry evaluates the effectiveness of the EPC approach, demonstrating that it minimizes time delays and costs. The IMBOA approach proposed in this study has the potential to mitigate 23% of risks and avoid 32% of risks associated with the action plan of China's coal mining industry. Furthermore, comparative analysis with other optimization models indicates that the developed IMBOA model yields superior results, reducing overall project time by 15% and cost by 18%.</p><h2>Other Information</h2><p dir="ltr">Published in: Neural Computing and Applications<br>License: <a href="https://creativecommons.org/licenses/by/4.0" target="_blank">https://creativecommons.org/licenses/by/4.0</a><br>See article on publisher's website: <a href="https://dx.doi.org/10.1007/s00521-024-10414-9" target="_blank">https://dx.doi.org/10.1007/s00521-024-10414-9</a></p>2024-11-18T09:00:00ZTextJournal contributioninfo:eu-repo/semantics/publishedVersiontextcontribution to journal10.1007/s00521-024-10414-9https://figshare.com/articles/journal_contribution/An_efficient_claim_management_assurance_system_using_EPC_contract_based_on_improved_monarch_butterfly_optimization_models/30094642CC BY 4.0info:eu-repo/semantics/openAccessoai:figshare.com:article/300946422024-11-18T09:00:00Z
spellingShingle An efficient claim management assurance system using EPC contract based on improved monarch butterfly optimization models
K. Mukilan (22224793)
Engineering
Manufacturing engineering
EPC
Claim management system
Improved monarch butterfly optimization
Risk analysis
Cost Quality
status_str publishedVersion
title An efficient claim management assurance system using EPC contract based on improved monarch butterfly optimization models
title_full An efficient claim management assurance system using EPC contract based on improved monarch butterfly optimization models
title_fullStr An efficient claim management assurance system using EPC contract based on improved monarch butterfly optimization models
title_full_unstemmed An efficient claim management assurance system using EPC contract based on improved monarch butterfly optimization models
title_short An efficient claim management assurance system using EPC contract based on improved monarch butterfly optimization models
title_sort An efficient claim management assurance system using EPC contract based on improved monarch butterfly optimization models
topic Engineering
Manufacturing engineering
EPC
Claim management system
Improved monarch butterfly optimization
Risk analysis
Cost Quality