A comparative analysis of MIP formulations for the multi-mode resource-constrained independent task scheduling problem
<p dir="ltr">We consider the problem of scheduling independent multi-mode tasks with multiple renewable resource constraints, aiming to minimize the weighted sum of tardinesses. This problem commonly arises in the context of multiproject scheduling. We propose three pseudo-polynomial...
محفوظ في:
| المؤلف الرئيسي: | Maryam Al-Khatib (19561909) (author) |
|---|---|
| مؤلفون آخرون: | Mohamed Haouari (10340697) (author), Mohamed Kharbeche (6579296) (author) |
| منشور في: |
2025
|
| الموضوعات: | |
| الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Damping-Assisted Evolutionary Swarm Intelligence for Industrial IoT Task Scheduling in Cloud Computing
حسب: Ahmed G. Gad (11381409)
منشور في: (2024) -
Efficient Prioritization and Processor Selection Schemes for HEFT Algorithm: A Makespan Optimizer for Task Scheduling in Cloud Environment
حسب: Sachi Gupta (19560268)
منشور في: (2022) -
Improved Jaya Synergistic Swarm Optimization Algorithm to Optimize Task Scheduling Problems in Cloud Computing
حسب: Abualigah, Laith
منشور في: (2024) -
Efficient methods and techniques for the open-shop scheduling problem. (c2006)
حسب: Bou Ghosn, Steve
منشور في: (2006) -
MAESTRO: Orchestrating Computational Offloading to Multiple FemtoClouds in Various Communication Environments
حسب: Hend Gedawy (23275984)
منشور في: (2022)