Vehicle-related parameters.

<div><p>In this study, the optimization of construction machinery scheduling within roadbed construction projects is explored, taking into account both personnel fatigue and sequence-dependent setup times. A sophisticated optimization model has been developed to simulate the optimal oper...

Full description

Saved in:
Bibliographic Details
Main Author: Dawei Wang (471687) (author)
Other Authors: Bo Gao (106513) (author), Lei Zhang (38117) (author)
Published: 2025
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!