Parameter settings for consumption quota model.
<div><p>The traditional quota compilation method has a large workload and requires a lot of manpower and material resources, making it difficult to apply to the consumption quota compilation in mechanical and electrical installation engineering of prefabricated buildings. Therefore, a co...
Saved in:
| Main Author: | |
|---|---|
| Other Authors: | , , |
| Published: |
2025
|
| Subjects: | |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!