Maintenance program.

<div><p>With the gradual expansion of China’s high-speed railroad operation scale and the accumulation of operation time, the pressure of operation and maintenance of contact networks is increasing, and the operation and maintenance strategy of railroad contact networks under the traditi...

وصف كامل

محفوظ في:
التفاصيل البيبلوغرافية
المؤلف الرئيسي: Zhijian Qu (6920060) (author)
مؤلفون آخرون: Xinyu Liao (6709862) (author), Rui Chi (9749809) (author), Baoquan Wei (21474224) (author), Xinxing Hou (21474227) (author)
منشور في: 2025
الموضوعات:
الوسوم: إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
_version_ 1852019717864161280
author Zhijian Qu (6920060)
author2 Xinyu Liao (6709862)
Rui Chi (9749809)
Baoquan Wei (21474224)
Xinxing Hou (21474227)
author2_role author
author
author
author
author_facet Zhijian Qu (6920060)
Xinyu Liao (6709862)
Rui Chi (9749809)
Baoquan Wei (21474224)
Xinxing Hou (21474227)
author_role author
dc.creator.none.fl_str_mv Zhijian Qu (6920060)
Xinyu Liao (6709862)
Rui Chi (9749809)
Baoquan Wei (21474224)
Xinxing Hou (21474227)
dc.date.none.fl_str_mv 2025-06-03T17:38:31Z
dc.identifier.none.fl_str_mv 10.1371/journal.pone.0321384.t005
dc.relation.none.fl_str_mv https://figshare.com/articles/dataset/Maintenance_program_/29227418
dc.rights.none.fl_str_mv CC BY 4.0
info:eu-repo/semantics/openAccess
dc.subject.none.fl_str_mv Medicine
Sociology
Computational Biology
Space Science
Biological Sciences not elsewhere classified
Information Systems not elsewhere classified
remaining useful life
inferior solution sets
029 thousand yuan
objective optimization algorithm
traditional maintenance method
southern china yielded
maintenance scheme obtained
maintenance method generated
maintaining higher reliability
objective maintenance optimization
contact networks system
spending 71 man
maintenance strategy mentioned
integrated state parameters
div >< p
objective optimization operation
railroad contact networks
low maintenance efficiency
low maintenance cost
high average reliability
high labor intensity
contact networks
maintenance strategy
average reliability
labor intensity
optimization goal
high reliability
railroad bureau
maintenance solutions
maintenance personnel
maintenance cost
contact force
china ’
initial reliability
labor productivity
transportation quality
speed railroads
simulation calculations
required man
pareto non
operation time
hanging strings
guide height
gradual expansion
etc </
double dilemma
dc.title.none.fl_str_mv Maintenance program.
dc.type.none.fl_str_mv Dataset
info:eu-repo/semantics/publishedVersion
dataset
description <div><p>With the gradual expansion of China’s high-speed railroad operation scale and the accumulation of operation time, the pressure of operation and maintenance of contact networks is increasing, and the operation and maintenance strategy of railroad contact networks under the traditional cyclic maintenance mode has the double dilemma of low maintenance efficiency and high labor intensity of maintenance personnel. In order to protect the transportation quality and efficiency of high-speed railroads and reduce the labor intensity of maintenance personnel, this paper proposes a multi-objective optimization operation and maintenance strategy for contact networks considering integrated state parameters, which is able to ensure the high reliability of contact networks while reducing the cost of maintenance and reducing the man-hours required for maintenance. Firstly, according to the integrated state parameters such as the guide height, contact force, pull-out value, and remaining useful life (RUL) of contact networks, the state of contact networks near specific towers is analyzed, revealing the initial reliability of the main equipment including contact wires, positioners, hanging strings, <i>etc</i>., which is used as a parameter of the multi-objective optimal maintenance model. Then, a multi-objective optimal maintenance model is established to achieve the optimization goal of high average reliability of contact networks, low maintenance cost and short required working hours. Finally, the model is solved by the multi-objective optimization algorithm to obtain a series of maintenance solutions in the form of Pareto non-inferior solution sets. Simulation calculations with data from a railroad bureau in southern China yielded that the average reliability of the contact networks system was 0.969, and the maintenance cost was 1,029 thousand yuan, spending 71 man-hours, when the maintenance method generated by the operation and maintenance strategy mentioned in this paper was used. Compared with the traditional maintenance method, the maintenance scheme obtained by the proposed in this paper optimizes the required man-hours and improves the labor productivity while maintaining higher reliability and lowering the maintenance cost.</p></div>
eu_rights_str_mv openAccess
id Manara_f2d0ec5f16c2a5c4e0870bacff2f5c07
identifier_str_mv 10.1371/journal.pone.0321384.t005
network_acronym_str Manara
network_name_str ManaraRepo
oai_identifier_str oai:figshare.com:article/29227418
publishDate 2025
repository.mail.fl_str_mv
repository.name.fl_str_mv
repository_id_str
rights_invalid_str_mv CC BY 4.0
spelling Maintenance program.Zhijian Qu (6920060)Xinyu Liao (6709862)Rui Chi (9749809)Baoquan Wei (21474224)Xinxing Hou (21474227)MedicineSociologyComputational BiologySpace ScienceBiological Sciences not elsewhere classifiedInformation Systems not elsewhere classifiedremaining useful lifeinferior solution sets029 thousand yuanobjective optimization algorithmtraditional maintenance methodsouthern china yieldedmaintenance scheme obtainedmaintenance method generatedmaintaining higher reliabilityobjective maintenance optimizationcontact networks systemspending 71 manmaintenance strategy mentionedintegrated state parametersdiv >< pobjective optimization operationrailroad contact networkslow maintenance efficiencylow maintenance costhigh average reliabilityhigh labor intensitycontact networksmaintenance strategyaverage reliabilitylabor intensityoptimization goalhigh reliabilityrailroad bureaumaintenance solutionsmaintenance personnelmaintenance costcontact forcechina ’initial reliabilitylabor productivitytransportation qualityspeed railroadssimulation calculationsrequired manpareto nonoperation timehanging stringsguide heightgradual expansionetc </double dilemma<div><p>With the gradual expansion of China’s high-speed railroad operation scale and the accumulation of operation time, the pressure of operation and maintenance of contact networks is increasing, and the operation and maintenance strategy of railroad contact networks under the traditional cyclic maintenance mode has the double dilemma of low maintenance efficiency and high labor intensity of maintenance personnel. In order to protect the transportation quality and efficiency of high-speed railroads and reduce the labor intensity of maintenance personnel, this paper proposes a multi-objective optimization operation and maintenance strategy for contact networks considering integrated state parameters, which is able to ensure the high reliability of contact networks while reducing the cost of maintenance and reducing the man-hours required for maintenance. Firstly, according to the integrated state parameters such as the guide height, contact force, pull-out value, and remaining useful life (RUL) of contact networks, the state of contact networks near specific towers is analyzed, revealing the initial reliability of the main equipment including contact wires, positioners, hanging strings, <i>etc</i>., which is used as a parameter of the multi-objective optimal maintenance model. Then, a multi-objective optimal maintenance model is established to achieve the optimization goal of high average reliability of contact networks, low maintenance cost and short required working hours. Finally, the model is solved by the multi-objective optimization algorithm to obtain a series of maintenance solutions in the form of Pareto non-inferior solution sets. Simulation calculations with data from a railroad bureau in southern China yielded that the average reliability of the contact networks system was 0.969, and the maintenance cost was 1,029 thousand yuan, spending 71 man-hours, when the maintenance method generated by the operation and maintenance strategy mentioned in this paper was used. Compared with the traditional maintenance method, the maintenance scheme obtained by the proposed in this paper optimizes the required man-hours and improves the labor productivity while maintaining higher reliability and lowering the maintenance cost.</p></div>2025-06-03T17:38:31ZDatasetinfo:eu-repo/semantics/publishedVersiondataset10.1371/journal.pone.0321384.t005https://figshare.com/articles/dataset/Maintenance_program_/29227418CC BY 4.0info:eu-repo/semantics/openAccessoai:figshare.com:article/292274182025-06-03T17:38:31Z
spellingShingle Maintenance program.
Zhijian Qu (6920060)
Medicine
Sociology
Computational Biology
Space Science
Biological Sciences not elsewhere classified
Information Systems not elsewhere classified
remaining useful life
inferior solution sets
029 thousand yuan
objective optimization algorithm
traditional maintenance method
southern china yielded
maintenance scheme obtained
maintenance method generated
maintaining higher reliability
objective maintenance optimization
contact networks system
spending 71 man
maintenance strategy mentioned
integrated state parameters
div >< p
objective optimization operation
railroad contact networks
low maintenance efficiency
low maintenance cost
high average reliability
high labor intensity
contact networks
maintenance strategy
average reliability
labor intensity
optimization goal
high reliability
railroad bureau
maintenance solutions
maintenance personnel
maintenance cost
contact force
china ’
initial reliability
labor productivity
transportation quality
speed railroads
simulation calculations
required man
pareto non
operation time
hanging strings
guide height
gradual expansion
etc </
double dilemma
status_str publishedVersion
title Maintenance program.
title_full Maintenance program.
title_fullStr Maintenance program.
title_full_unstemmed Maintenance program.
title_short Maintenance program.
title_sort Maintenance program.
topic Medicine
Sociology
Computational Biology
Space Science
Biological Sciences not elsewhere classified
Information Systems not elsewhere classified
remaining useful life
inferior solution sets
029 thousand yuan
objective optimization algorithm
traditional maintenance method
southern china yielded
maintenance scheme obtained
maintenance method generated
maintaining higher reliability
objective maintenance optimization
contact networks system
spending 71 man
maintenance strategy mentioned
integrated state parameters
div >< p
objective optimization operation
railroad contact networks
low maintenance efficiency
low maintenance cost
high average reliability
high labor intensity
contact networks
maintenance strategy
average reliability
labor intensity
optimization goal
high reliability
railroad bureau
maintenance solutions
maintenance personnel
maintenance cost
contact force
china ’
initial reliability
labor productivity
transportation quality
speed railroads
simulation calculations
required man
pareto non
operation time
hanging strings
guide height
gradual expansion
etc </
double dilemma