_version_ 1852019785906257920
author Xuwei Liu (6034592)
author2 Wenting Tang (2627902)
Lisha Si (21463912)
Yongde Li (13544376)
author2_role author
author
author
author_facet Xuwei Liu (6034592)
Wenting Tang (2627902)
Lisha Si (21463912)
Yongde Li (13544376)
author_role author
dc.creator.none.fl_str_mv Xuwei Liu (6034592)
Wenting Tang (2627902)
Lisha Si (21463912)
Yongde Li (13544376)
dc.date.none.fl_str_mv 2025-06-02T17:29:39Z
dc.identifier.none.fl_str_mv 10.1371/journal.pone.0324854.t003
dc.relation.none.fl_str_mv https://figshare.com/articles/dataset/Sample_data_of_the_project_in_the_past_six_months_/29213686
dc.rights.none.fl_str_mv CC BY 4.0
info:eu-repo/semantics/openAccess
dc.subject.none.fl_str_mv Biophysics
Biotechnology
Science Policy
Space Science
Biological Sciences not elsewhere classified
quota compilation efficiency
prediction error rates
mean squared errors
cost savings rates
average absolute errors
artificial neural networks
artificial neural network
electrical installation engineering
consumption quota compilation
mechanical equipment use
mechanical equipment usage
proposed model achieved
48 %, respectively
48 %, 1
21 %, 4
1 %, respectively
1 %,
material consumption
engineering budgeting
85 %,
25 %,
research model
model performance
designed model
1 %.
xlink ">
traditional models
testing sets
statistical theory
results showed
relatively low
regularization techniques
prefabricated components
prefabricated buildings
material resources
large workload
labor hours
economic benefits
determination coefficients
8 %,
4 %.
dc.title.none.fl_str_mv Sample data of the project in the past six months.
dc.type.none.fl_str_mv Dataset
info:eu-repo/semantics/publishedVersion
dataset
description <p>Sample data of the project in the past six months.</p>
eu_rights_str_mv openAccess
id Manara_fb9f9fade631e2fbf8f2bae5fc1d0c8c
identifier_str_mv 10.1371/journal.pone.0324854.t003
network_acronym_str Manara
network_name_str ManaraRepo
oai_identifier_str oai:figshare.com:article/29213686
publishDate 2025
repository.mail.fl_str_mv
repository.name.fl_str_mv
repository_id_str
rights_invalid_str_mv CC BY 4.0
spelling Sample data of the project in the past six months.Xuwei Liu (6034592)Wenting Tang (2627902)Lisha Si (21463912)Yongde Li (13544376)BiophysicsBiotechnologyScience PolicySpace ScienceBiological Sciences not elsewhere classifiedquota compilation efficiencyprediction error ratesmean squared errorscost savings ratesaverage absolute errorsartificial neural networksartificial neural networkelectrical installation engineeringconsumption quota compilationmechanical equipment usemechanical equipment usageproposed model achieved48 %, respectively48 %, 121 %, 41 %, respectively1 %,material consumptionengineering budgeting85 %,25 %,research modelmodel performancedesigned model1 %.xlink ">traditional modelstesting setsstatistical theoryresults showedrelatively lowregularization techniquesprefabricated componentsprefabricated buildingsmaterial resourceslarge workloadlabor hourseconomic benefitsdetermination coefficients8 %,4 %.<p>Sample data of the project in the past six months.</p>2025-06-02T17:29:39ZDatasetinfo:eu-repo/semantics/publishedVersiondataset10.1371/journal.pone.0324854.t003https://figshare.com/articles/dataset/Sample_data_of_the_project_in_the_past_six_months_/29213686CC BY 4.0info:eu-repo/semantics/openAccessoai:figshare.com:article/292136862025-06-02T17:29:39Z
spellingShingle Sample data of the project in the past six months.
Xuwei Liu (6034592)
Biophysics
Biotechnology
Science Policy
Space Science
Biological Sciences not elsewhere classified
quota compilation efficiency
prediction error rates
mean squared errors
cost savings rates
average absolute errors
artificial neural networks
artificial neural network
electrical installation engineering
consumption quota compilation
mechanical equipment use
mechanical equipment usage
proposed model achieved
48 %, respectively
48 %, 1
21 %, 4
1 %, respectively
1 %,
material consumption
engineering budgeting
85 %,
25 %,
research model
model performance
designed model
1 %.
xlink ">
traditional models
testing sets
statistical theory
results showed
relatively low
regularization techniques
prefabricated components
prefabricated buildings
material resources
large workload
labor hours
economic benefits
determination coefficients
8 %,
4 %.
status_str publishedVersion
title Sample data of the project in the past six months.
title_full Sample data of the project in the past six months.
title_fullStr Sample data of the project in the past six months.
title_full_unstemmed Sample data of the project in the past six months.
title_short Sample data of the project in the past six months.
title_sort Sample data of the project in the past six months.
topic Biophysics
Biotechnology
Science Policy
Space Science
Biological Sciences not elsewhere classified
quota compilation efficiency
prediction error rates
mean squared errors
cost savings rates
average absolute errors
artificial neural networks
artificial neural network
electrical installation engineering
consumption quota compilation
mechanical equipment use
mechanical equipment usage
proposed model achieved
48 %, respectively
48 %, 1
21 %, 4
1 %, respectively
1 %,
material consumption
engineering budgeting
85 %,
25 %,
research model
model performance
designed model
1 %.
xlink ">
traditional models
testing sets
statistical theory
results showed
relatively low
regularization techniques
prefabricated components
prefabricated buildings
material resources
large workload
labor hours
economic benefits
determination coefficients
8 %,
4 %.