Flexible Scheduling for Construction Projects
A Master of Science thesis in Engineering Systems Management by Mohammad Fahmi Saleh Saleh entitled, "Flexible Scheduling for Construction Projects," submitted in January 2012. Available are both soft and hard copies of the thesis.
Saved in:
| Main Author: | Saleh, Mohammad Fahmi Saleh (author) |
|---|---|
| Format: | doctoralThesis |
| Published: |
2012
|
| Subjects: | |
| Online Access: | http://hdl.handle.net/11073/2759 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The attitude of project managers toward using Microsoft project for planning and scheduling. (c1997)
by: Yafawi, Khalil Ibrahim
Published: (1997) -
Cyclic Production Scheduling with Remanufacturing
by: Aminipour, Armin
Published: (2015) -
Carbon dioxide adsorption in microwave-synthesized metal organic framework CPM-5: Equilibrium and kinetics study
by: Sabouni, Rana
Published: (2013) -
Efficient methods and techniques for the open-shop scheduling problem. (c2006)
by: Bou Ghosn, Steve
Published: (2006) -
The Impact of Innovation on The Competitiveness of Building Construction Projects
by: Dar Amer, Sabreen Fayiz
Published: (2019)