Modeling of tri-parameter contracts integrating cost, time and risk
A Master of Science thesis in Civil Engineering by Mohamad M. Rabie entitled, "Modeling of Tri-Parameter Contracts Integrating Cost, Time and Risk," submitted in June 2014. Thesis advisor is Dr. Sameh M. El-Sayegh. Available are both soft and hard copies of the thesis.
Saved in:
| Main Author: | Rabie, Mohamad M. (author) |
|---|---|
| Format: | doctoralThesis |
| Published: |
2014
|
| Subjects: | |
| Online Access: | http://hdl.handle.net/11073/7721 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The Role of Risk Allocation in Minimizing Disputes in Construction Contracts
by: Odunusi, Ganiyu Olawale
Published: (2014) -
Simulating and comparing various price-driven bid selection methods from an owner's perspective. (c2017)
by: Ammoury, Michael Fayez
Published: (2017) -
The Significance of AI in Mitigating Risk-Based Disputes in Construction Contracts
by: RAMADAN, MOHAMED NABIL
Published: (2023) -
Performance Comparison between Design-Build vs. Design-Bid-Build in construction projects at UAE
by: KATARIA, SHERIF MOKHTAR AHMAED
Published: (2021) -
Critical assessment of construction contract administration using fuzzy structural equation modeling
by: Murat Gunduz (16875960)
Published: (2020)