Identifying the Inherent Factors Causing Delays in the UAE Construction Industry

A Master of Science thesis in Engineering Systems Management by Haitham Alajmani entitled, “Identifying the Inherent Factors Causing Delays in the UAE Construction Industry”, submitted in April 2021. Thesis advisor is Dr. Sameh El-Sayegh. Soft copy is available (Thesis, Completion Certificate, Appro...

Full description

Saved in:
Bibliographic Details
Main Author: Alajmani, Haitham (author)
Format: doctoralThesis
Published: 2021
Subjects:
Online Access:http://hdl.handle.net/11073/21514
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1864513439279349760
author Alajmani, Haitham
author_facet Alajmani, Haitham
author_role author
dc.contributor.none.fl_str_mv El-Sayegh, Sameh
dc.creator.none.fl_str_mv Alajmani, Haitham
dc.date.none.fl_str_mv 2021-06-22T12:04:06Z
2021-06-22T12:04:06Z
2021-04
dc.format.none.fl_str_mv application/pdf
dc.identifier.none.fl_str_mv 35.232-2021.13
http://hdl.handle.net/11073/21514
dc.language.none.fl_str_mv en_US
dc.subject.none.fl_str_mv Construction industry
Frequency
Severity
Importance
Causes and effects of delays
United Arab Emirates (UAE)
dc.title.none.fl_str_mv Identifying the Inherent Factors Causing Delays in the UAE Construction Industry
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/doctoralThesis
description A Master of Science thesis in Engineering Systems Management by Haitham Alajmani entitled, “Identifying the Inherent Factors Causing Delays in the UAE Construction Industry”, submitted in April 2021. Thesis advisor is Dr. Sameh El-Sayegh. Soft copy is available (Thesis, Completion Certificate, Approval Signatures, and AUS Archives Consent Form).
format doctoralThesis
id aus_f697cbe67a2d1a93ccf50e29e3912574
identifier_str_mv 35.232-2021.13
language_invalid_str_mv en_US
network_acronym_str aus
network_name_str aus
oai_identifier_str oai:repository.aus.edu:11073/21514
publishDate 2021
repository.mail.fl_str_mv
repository.name.fl_str_mv
repository_id_str
spelling Identifying the Inherent Factors Causing Delays in the UAE Construction IndustryAlajmani, HaithamConstruction industryFrequencySeverityImportanceCauses and effects of delaysUnited Arab Emirates (UAE)A Master of Science thesis in Engineering Systems Management by Haitham Alajmani entitled, “Identifying the Inherent Factors Causing Delays in the UAE Construction Industry”, submitted in April 2021. Thesis advisor is Dr. Sameh El-Sayegh. Soft copy is available (Thesis, Completion Certificate, Approval Signatures, and AUS Archives Consent Form).The construction industry is one of the most important industries that impact the economy of a country as it contributes significantly to the GDP, employment, and wealth. The UAE construction industry contributes to 8.7% of the overall GDP which makes it a key industry for the country’s economy. The industry is challenged with several risks that plague the performance of the projects where most projects experience significant delays. Some of the consequences of the delays include loss of revenues for the owners, loss of future opportunities for the contractors, and litigation. The UAE has one of the most dynamic economies in the world, but it has also been suffering from delays in the execution of its construction projects. There is lack of recent research that identifies the most frequent, severe, and important causes and effects of delays in the UAE construction industry. This thesis aims to scrutinize the construction industry in the UAE and determine the most important causes of delays, the most frequent factors, the most severe factors, and the most important effects of delays. A total of 40 delay causes and 10 effects were identified through the literature review. A questionnaire was prepared and distributed to professionals in the UAE construction industry. A total of 128 responses were received and analyzed from owners, consultants, contractors, and the overall perspectives. Overall, the most important causes of delays were “Award the project to the lowest bidder”, “Delay in progress payment by the owner”, and “Change orders by the owner”. A high level of agreement was found between the consultants and contractors according to Spearman’s rank correlation results. The most frequent cause of delay was found to be “Award the project to the lowest bidder” while the most severe cause was found to be “Financial crisis”. The most likely effects were “Time overrun/extension of time” and “Poor quality of work due to hurrying the project”. Using Factor Analysis, 6 components are extracted explaining 83.87% of the total variance. Several recommendations are provided to mitigate the delays and to reduce the frequency and impact of the key causes.College of EngineeringMultidisciplinary ProgramsMaster of Science in Engineering Systems Management (MSESM)El-Sayegh, Sameh2021-06-22T12:04:06Z2021-06-22T12:04:06Z2021-04info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/doctoralThesisapplication/pdf35.232-2021.13http://hdl.handle.net/11073/21514en_USoai:repository.aus.edu:11073/215142025-06-26T12:20:23Z
spellingShingle Identifying the Inherent Factors Causing Delays in the UAE Construction Industry
Alajmani, Haitham
Construction industry
Frequency
Severity
Importance
Causes and effects of delays
United Arab Emirates (UAE)
status_str publishedVersion
title Identifying the Inherent Factors Causing Delays in the UAE Construction Industry
title_full Identifying the Inherent Factors Causing Delays in the UAE Construction Industry
title_fullStr Identifying the Inherent Factors Causing Delays in the UAE Construction Industry
title_full_unstemmed Identifying the Inherent Factors Causing Delays in the UAE Construction Industry
title_short Identifying the Inherent Factors Causing Delays in the UAE Construction Industry
title_sort Identifying the Inherent Factors Causing Delays in the UAE Construction Industry
topic Construction industry
Frequency
Severity
Importance
Causes and effects of delays
United Arab Emirates (UAE)
url http://hdl.handle.net/11073/21514