From interactive control to IT project performance: examining the mediating role of stakeholder analysis effectiveness
Purpose–Thispaperaimstounpacktherelationshipbetweentheinteractiveuseof project control systems (PCS) and project performance by examining the role of stakeholder analysis effectiveness in enacting this relationship. A conceptual framework was developed based on the stakeholder theory and the levers...
Saved in:
| Main Author: | |
|---|---|
| Other Authors: | |
| Published: |
2022
|
| Online Access: | https://bspace.buid.ac.ae/handle/1234/3677 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!