Study of Life Cycle Cost Analysis and Value Engineering and their use in UAE
When planning a project, the main stakeholders' concern is always about the potential for failures, defects, delays, overruns, and conflicts that the project might face. According to studies and statistics, most projects take around 20% longer than scheduled to complete and frequently go much o...
محفوظ في:
| المؤلف الرئيسي: | |
|---|---|
| منشور في: |
2021
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | https://bspace.buid.ac.ae/handle/1234/1903 |
| الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|