Dispute Resolution Mechanism under The 2017 FIDIC Red Book
The disputes between the contracting parties in construction projects are unavoidable due to the nature and complexity of the construction contracts; therefore it is important to include a dispute resolution mechanism in the construction contracts, using one of the popular standard form of contracts...
Saved in:
| Main Author: | Hdaib, Amer (author) |
|---|---|
| Published: |
2019
|
| Subjects: | |
| Online Access: | https://bspace.buid.ac.ae/handle/1234/1482 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Understanding Foreseeability in Construction Contracts 1999 FIDIC Red Book as an Example
by: K. Masadeh, Aymen
Published: (2005) -
The Users’ Perceptions on the Impartiality of the Engineer under the FIDIC Red Book
by: Akulenka, Iryna
Published: (2013) -
Adopting FIDIC 2017 Red Book Extension of Time Procedure for Construction Projects in UAE
by: BDAIWI, YAMAN MUSTFA
Published: (2018) -
The Applications Of The Variation Clauses Of The FIDIC Red Book 1987 And 1999: Analytical And Empirical Study Under the UAE Law
by: Al Hin, Saif Al Din
Published: (2014) -
FIDIC 1999 (Red Book) Dispute Adjudication Board’s: The UAE Construction Industry Perspective
by: BRUEN, DARREN
Published: (2018)