Analyzing the Importance of Cost Overrun Planning and Control for Construction Projects Success in the UAE Region
Cost overruns are considered a major hindrance to project completion as they lead to a decline in the contractor's income, resulting in significant financial setbacks and endangering the entire project. The cost of construction stands as a critical element in determining the project's over...
محفوظ في:
| المؤلف الرئيسي: | EL KHATIB, AHMAD (author) |
|---|---|
| منشور في: |
2023
|
| الوصول للمادة أونلاين: | https://bspace.buid.ac.ae/handle/1234/2479 |
| الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
A Study on the impact of leadership traits on projects success and cost overrun: the case of project based construction organisations in the UAE
حسب: GOUDEH, SEIF ABD ELMAOWLA
منشور في: (2018) -
The Influence of Risks on the Cost Overrun of ICT Network Projects
حسب: AL NAUIMI, HAMAD KHALIFA SUWAIDAN
منشور في: (2018) -
Life Cycle Cost Analysis as a Technique to Reduce Project’s Cost Overruns of Assets in UAE: A Case Study-Based Research
حسب: El Gergawy, Yahia
منشور في: (2011) -
Project Crisis Management Techniques to Overcome the Problems of Schedule Delays and Cost Overruns
حسب: Halloum, Mohammad
منشور في: (2010) -
Developing a Stochastic Model to Predict Cost Overrun due to the Causes of Projects Delay in Oil Fields Construction Industry
حسب: ALKHOORI, KHALID ABDUL MAJEED
منشور في: (2020)