Works within or outside the Scope of Variation Clause Under the 2017 FIDIC Red Book
"Variations are inevitable in most construction contracts and occur when one party to a contract, often an employer, alter the content of the contract. In most construction contracts the employer has the right to unilaterally alter the content of the contract according to a variation clause in...
Saved in:
| Main Author: | Zumeili, Mohamad (author) |
|---|---|
| Published: |
2019
|
| Subjects: | |
| Online Access: | https://bspace.buid.ac.ae/handle/1234/1473 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The Applications Of The Variation Clauses Of The FIDIC Red Book 1987 And 1999: Analytical And Empirical Study Under the UAE Law
by: Al Hin, Saif Al Din
Published: (2014) -
Dispute Resolution Mechanism under The 2017 FIDIC Red Book
by: Hdaib, Amer
Published: (2019) -
The Users’ Perceptions on the Impartiality of the Engineer under the FIDIC Red Book
by: Akulenka, Iryna
Published: (2013) -
Adopting FIDIC 2017 Red Book Extension of Time Procedure for Construction Projects in UAE
by: BDAIWI, YAMAN MUSTFA
Published: (2018) -
Applicability of the 2017 FIDIC Red Book in Civil Law Jurisdictions
by: Hisham Al-Hyari, Omar
Published: (2020)