A Comparative Analysis between the Application of Liquidated Damages Under English Law and UAE Law
Delay is one of the most common breaches in the construction field, and, over the years, construction professionals have come accustomed to remedy this breach through the application of liquidated damages. This dissertation studies the concept of liquidated damages under two different legal systems:...
محفوظ في:
| المؤلف الرئيسي: | ALAWADHI, MARWA (author) |
|---|---|
| منشور في: |
2022
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | https://bspace.buid.ac.ae/handle/1234/2195 |
| الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
The Treatments of Liquidated Damages under the English and the UAE Laws
حسب: MUJAHED, YAZEED
منشور في: (2021) -
Liquidated Damages versus Delay Penalties and Limitation of Liability: A Comparison between the English and United Arab Emirates Law
حسب: Bakir, Wissam
منشور في: (2016) -
Delay in Completion and the Employer's Entitlement for Liquidated Damages under UAE Law and FIDIC Standard form Contracts
حسب: KHRAIS, RAMI ISSA
منشور في: (2021) -
TERMINATION OF CONSTRUCTION CONTRACTS AND THE RELATED APPLICATION OF LIQUIDATED DAMAGES
حسب: EL BAKEY, AHMED ELSAYED ABD
منشور في: (2018) -
Apportioning subcontractors’ liability for project delays; a consensus approach
حسب: Thomas, Manoj
منشور في: (2020)