Common Delay Analysis Methods and Factors Influencing the Selection of Such Methods in Construction Projects in UAE

DISSERTATION WITH DISTINCTION

Saved in:
Bibliographic Details
Main Author: Abdelhadi, Yazeed Fawwaz Jamal (author)
Published: 2015
Subjects:
Online Access:http://bspace.buid.ac.ae/handle/1234/753
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1862980610179465216
author Abdelhadi, Yazeed Fawwaz Jamal
author_facet Abdelhadi, Yazeed Fawwaz Jamal
author_role author
dc.creator.none.fl_str_mv Abdelhadi, Yazeed Fawwaz Jamal
dc.date.none.fl_str_mv 2015-08-24T12:13:25Z
2015-08-24T12:13:25Z
2015-06
dc.format.none.fl_str_mv application/pdf
dc.identifier.none.fl_str_mv 120056
http://bspace.buid.ac.ae/handle/1234/753
dc.language.none.fl_str_mv en
dc.publisher.none.fl_str_mv The British University in Dubai (BUiD)
dc.subject.none.fl_str_mv delay analysis
construction projects
construction industry
United Arab Emirates (UAE)
dc.title.none.fl_str_mv Common Delay Analysis Methods and Factors Influencing the Selection of Such Methods in Construction Projects in UAE
dc.type.none.fl_str_mv Dissertation
description DISSERTATION WITH DISTINCTION
id budr_a1323d683cc89706c25e969d0865a0be
identifier_str_mv 120056
language_invalid_str_mv en
network_acronym_str budr
network_name_str The British University in Dubai repository
oai_identifier_str oai:bspace.buid.ac.ae:1234/753
publishDate 2015
publisher.none.fl_str_mv The British University in Dubai (BUiD)
repository.mail.fl_str_mv
repository.name.fl_str_mv
repository_id_str
spelling Common Delay Analysis Methods and Factors Influencing the Selection of Such Methods in Construction Projects in UAEAbdelhadi, Yazeed Fawwaz Jamaldelay analysisconstruction projectsconstruction industryUnited Arab Emirates (UAE)DISSERTATION WITH DISTINCTIONDelays are one of the common issues faced in construction projects. While some cases might be easy to analyse, most of the cases are complex and difficult. In the past century, various delay analysis methods have been developed and used in the construction industry for the purpose of analysing the delay, their effects and the liability for their consequences. With projects varying in nature and complexity and with multiple types of delay analysis methodologies, conflicts started arising in projects over which delay analysis method should be used and why. This dissertation examines the common used delay analysis methods in the UAE and the factors that would influence the decision as to the appropriate delay analysis method adopted by Contractors. A conceptual model has been developed after reviewing the available literature on the subject. The model summarizes the common acceptable delay analysis methodologies along with the common factors influencing the selection of such methodologies. The conceptual model has been further enhanced through interviewing three delay analysis experts that have been involved in projects in the gulf region in the past ten years. An investigation has been carried out in the local market through analysing the data of five case studies and interviewing the relevant planners and delay analysts to investigate current practices and perceived effectiveness of the adopted methods. The main finding of the research is that there is some sort of agreement on the general acceptable framework of performing delay analysis by Contractors. A clear set of factors for the selection of the delay analysis methods has been identified. The main identified factors were the attitude of the Clients, experience of the delay analyst, complexity of the project, time of performing the analysis, and the available time and cost for performing the analysis. The overall conclusion of the research was that the windows analysis method is generally considered as the most reliable and acceptable method in UAE. However, no generalization can be made in terms of the most appropriate delay analysis methodologies as this remains a discrete subjective decision of the delay analyst based on his view of the considered factors in each project.The British University in Dubai (BUiD)2015-08-24T12:13:25Z2015-08-24T12:13:25Z2015-06Dissertationapplication/pdf120056http://bspace.buid.ac.ae/handle/1234/753enoai:bspace.buid.ac.ae:1234/7532021-11-07T12:09:22Z
spellingShingle Common Delay Analysis Methods and Factors Influencing the Selection of Such Methods in Construction Projects in UAE
Abdelhadi, Yazeed Fawwaz Jamal
delay analysis
construction projects
construction industry
United Arab Emirates (UAE)
title Common Delay Analysis Methods and Factors Influencing the Selection of Such Methods in Construction Projects in UAE
title_full Common Delay Analysis Methods and Factors Influencing the Selection of Such Methods in Construction Projects in UAE
title_fullStr Common Delay Analysis Methods and Factors Influencing the Selection of Such Methods in Construction Projects in UAE
title_full_unstemmed Common Delay Analysis Methods and Factors Influencing the Selection of Such Methods in Construction Projects in UAE
title_short Common Delay Analysis Methods and Factors Influencing the Selection of Such Methods in Construction Projects in UAE
title_sort Common Delay Analysis Methods and Factors Influencing the Selection of Such Methods in Construction Projects in UAE
topic delay analysis
construction projects
construction industry
United Arab Emirates (UAE)
url http://bspace.buid.ac.ae/handle/1234/753