Delay to Projects - Cause, Effect and Measures to Reduce/Eliminate Delay by Mitigation/Acceleration

Delay to projects is one of the foremost concerns of the construction industry in the United Arab Emirates. The delays to the projects are affecting the economies throughout the world. Delay to projects mean the slowdown of development in all other related fields. The main aim and objective of this...

وصف كامل

محفوظ في:
التفاصيل البيبلوغرافية
المؤلف الرئيسي: Saeed, Shaikh Asif Abdus (author)
منشور في: 2009
الموضوعات:
الوصول للمادة أونلاين:http://bspace.buid.ac.ae/handle/1234/234
الوسوم: إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
_version_ 1862980619397496832
author Saeed, Shaikh Asif Abdus
author_facet Saeed, Shaikh Asif Abdus
author_role author
dc.creator.none.fl_str_mv Saeed, Shaikh Asif Abdus
dc.date.none.fl_str_mv 2009-08
2013-07-09T06:06:57Z
2013-07-09T06:06:57Z
dc.format.none.fl_str_mv application/pdf
dc.identifier.none.fl_str_mv 60046
http://bspace.buid.ac.ae/handle/1234/234
dc.language.none.fl_str_mv en
dc.publisher.none.fl_str_mv British University in Dubai
dc.subject.none.fl_str_mv Delay to projects
construction industry
United Arab Emirates (UAE)
mitigation
dc.title.none.fl_str_mv Delay to Projects - Cause, Effect and Measures to Reduce/Eliminate Delay by Mitigation/Acceleration
dc.type.none.fl_str_mv Dissertation
description Delay to projects is one of the foremost concerns of the construction industry in the United Arab Emirates. The delays to the projects are affecting the economies throughout the world. Delay to projects mean the slowdown of development in all other related fields. The main aim and objective of this dissertation is to evaluate the various types of delays and the reasons for those delays that are currently affecting the projects in the United Arab Emirates. Measures from previous researches to reduce or eliminate these delays by methods of mitigation or acceleration are analyzed for the case studies considered for this research. There are various types of delays which are identified. It is important to identify whether the delay is critical or not as identification of critical delays helps in taking appropriate measures at the correct time. The delay may be non excusable (contractor caused) for which the client and the consultant need to have project management tools to effectively manage the delays or compensable (client caused) delays which are due to the client. The delays may be by either parties and can be concurrent. The reasons for delays are primarily due to an unreasonable project scope, inadequate early planning and the absence of risk management systems. The contractor further contributes to delay due to lack of resources and labor productivity. Over ambitious estimates, incorrect task assessment ,lack of task clarity, design/ approval delays and interference in the decision making process by the client add on to the delay. Research done earlier indicates that “changed work complicates a project and invites delays” ( Molner , 2007). Delays that are non excusable (contractor caused) “expose a contractor to delay claims of its subcontractors and liquidated damages” ( Schumacher , 1995 ). Delays that are compensable (owner caused) need the support of specialty contractors who need to be nominated at the appropriate time ( Gil , 2001 ). The mitigation of delays was discussed by application of knowledge management and project learning. The lessons learnt feedback gives important information related to the mitigation measures considered for implementation. The prevention of delay can be done through mitigation and/or acceleration. It is important to plan/analyze the requirement in detail. This has been done by identifying the risks and mapping resources. The estimation and allocation of works was done to modularize the works and any issues likely to delay the works can be escalated for decisions and discussion. 60046 3 A detailed case study has been carried out for three projects in the United Arab Emirates. The first case study deals with a project which encountered delays and implemented measures of mitigation and acceleration to reduce the delays. The second case is a project which failed in its objectives of completion in time as well as budget. The third case is success project, where in spite of initial delays the project was completed on time by implementing mitigation and acceleration measures. The methodology implemented is acquisition of key data and justifying by providing adequate reasons regarding the data. Results and analysis for the case studies were structured according to methodology and further detailed into planning, resource, cost and nominations analysis. The finding from the case studies are that the main delay to the projects are compensable delays (owner caused)as seen case study 1 where the owner delayed the nomination. The findings from Case study 2 are the lack of decisions by the client and commitment to the project affected the project to an extent that the project could not achieve its goals. The findings from the case study 3 are that even if there is an initial delay, it can be overcome by teamwork and contribution from all the stakeholders to achieve success.
id budr_a72c09b0dece548bb04b8fc1fe1d5418
identifier_str_mv 60046
language_invalid_str_mv en
network_acronym_str budr
network_name_str The British University in Dubai repository
oai_identifier_str oai:bspace.buid.ac.ae:1234/234
publishDate 2009
publisher.none.fl_str_mv British University in Dubai
repository.mail.fl_str_mv
repository.name.fl_str_mv
repository_id_str
spelling Delay to Projects - Cause, Effect and Measures to Reduce/Eliminate Delay by Mitigation/AccelerationSaeed, Shaikh Asif AbdusDelay to projectsconstruction industryUnited Arab Emirates (UAE)mitigationDelay to projects is one of the foremost concerns of the construction industry in the United Arab Emirates. The delays to the projects are affecting the economies throughout the world. Delay to projects mean the slowdown of development in all other related fields. The main aim and objective of this dissertation is to evaluate the various types of delays and the reasons for those delays that are currently affecting the projects in the United Arab Emirates. Measures from previous researches to reduce or eliminate these delays by methods of mitigation or acceleration are analyzed for the case studies considered for this research. There are various types of delays which are identified. It is important to identify whether the delay is critical or not as identification of critical delays helps in taking appropriate measures at the correct time. The delay may be non excusable (contractor caused) for which the client and the consultant need to have project management tools to effectively manage the delays or compensable (client caused) delays which are due to the client. The delays may be by either parties and can be concurrent. The reasons for delays are primarily due to an unreasonable project scope, inadequate early planning and the absence of risk management systems. The contractor further contributes to delay due to lack of resources and labor productivity. Over ambitious estimates, incorrect task assessment ,lack of task clarity, design/ approval delays and interference in the decision making process by the client add on to the delay. Research done earlier indicates that “changed work complicates a project and invites delays” ( Molner , 2007). Delays that are non excusable (contractor caused) “expose a contractor to delay claims of its subcontractors and liquidated damages” ( Schumacher , 1995 ). Delays that are compensable (owner caused) need the support of specialty contractors who need to be nominated at the appropriate time ( Gil , 2001 ). The mitigation of delays was discussed by application of knowledge management and project learning. The lessons learnt feedback gives important information related to the mitigation measures considered for implementation. The prevention of delay can be done through mitigation and/or acceleration. It is important to plan/analyze the requirement in detail. This has been done by identifying the risks and mapping resources. The estimation and allocation of works was done to modularize the works and any issues likely to delay the works can be escalated for decisions and discussion. 60046 3 A detailed case study has been carried out for three projects in the United Arab Emirates. The first case study deals with a project which encountered delays and implemented measures of mitigation and acceleration to reduce the delays. The second case is a project which failed in its objectives of completion in time as well as budget. The third case is success project, where in spite of initial delays the project was completed on time by implementing mitigation and acceleration measures. The methodology implemented is acquisition of key data and justifying by providing adequate reasons regarding the data. Results and analysis for the case studies were structured according to methodology and further detailed into planning, resource, cost and nominations analysis. The finding from the case studies are that the main delay to the projects are compensable delays (owner caused)as seen case study 1 where the owner delayed the nomination. The findings from Case study 2 are the lack of decisions by the client and commitment to the project affected the project to an extent that the project could not achieve its goals. The findings from the case study 3 are that even if there is an initial delay, it can be overcome by teamwork and contribution from all the stakeholders to achieve success.British University in Dubai2013-07-09T06:06:57Z2013-07-09T06:06:57Z2009-08Dissertationapplication/pdf60046http://bspace.buid.ac.ae/handle/1234/234enoai:bspace.buid.ac.ae:1234/2342022-06-14T08:16:30Z
spellingShingle Delay to Projects - Cause, Effect and Measures to Reduce/Eliminate Delay by Mitigation/Acceleration
Saeed, Shaikh Asif Abdus
Delay to projects
construction industry
United Arab Emirates (UAE)
mitigation
title Delay to Projects - Cause, Effect and Measures to Reduce/Eliminate Delay by Mitigation/Acceleration
title_full Delay to Projects - Cause, Effect and Measures to Reduce/Eliminate Delay by Mitigation/Acceleration
title_fullStr Delay to Projects - Cause, Effect and Measures to Reduce/Eliminate Delay by Mitigation/Acceleration
title_full_unstemmed Delay to Projects - Cause, Effect and Measures to Reduce/Eliminate Delay by Mitigation/Acceleration
title_short Delay to Projects - Cause, Effect and Measures to Reduce/Eliminate Delay by Mitigation/Acceleration
title_sort Delay to Projects - Cause, Effect and Measures to Reduce/Eliminate Delay by Mitigation/Acceleration
topic Delay to projects
construction industry
United Arab Emirates (UAE)
mitigation
url http://bspace.buid.ac.ae/handle/1234/234