Delay to Projects - Cause, Effect and Measures to Reduce/Eliminate Delay by Mitigation/Acceleration
Delay to projects is one of the foremost concerns of the construction industry in the United Arab Emirates. The delays to the projects are affecting the economies throughout the world. Delay to projects mean the slowdown of development in all other related fields. The main aim and objective of this...
Saved in:
| Main Author: | Saeed, Shaikh Asif Abdus (author) |
|---|---|
| Published: |
2009
|
| Subjects: | |
| Online Access: | http://bspace.buid.ac.ae/handle/1234/234 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Developing a Stochastic Model to Predict Cost Overrun due to the Causes of Projects Delay in Oil Fields Construction Industry
by: ALKHOORI, KHALID ABDUL MAJEED
Published: (2020) -
Root Causes of Delays in the Construction Projects in the UAE Public Sector and the Client’s Project Manager role in Mitigation
by: ATOUT, SAMI MAMOON MOUSA
Published: (2021) -
Solar PV Construction Project Delays and Mitigation Strategies to Enhance Projects Timeline Performance A case study From Dubai’s Environment
by: AL-KHALIDI, ABDULRAHMAN BASIL
Published: (2022) -
Causes of Delay in Construction Projects In Abu Dhabi
by: ur Rehman, Ghias
Published: (2015) -
LEGAL ANALYSIS OF CONCURRENT DELAY CLAIMS IN CONSTRUCTION PROJECTS AND EVALUATION OF ENTITLEMENT USING APPORTIONMENT PRINCIPLE
by: JOSEPH, BINU
Published: (2015)