The Influence of Risks on the Success of the Development and Installation of Temporary Structure in Event Projects in Dubai

The number of events in Dubai is getting increased and the temporary structures have been widely used as a mandatory element to support the event’s venue whether to expand the capability of the venue or to create the ambience for the event. Purpose – This study aims to recognize the risks arising th...

Full description

Saved in:
Bibliographic Details
Main Author: POOBAMPEN, PAVINEE (author)
Published: 2017
Subjects:
Online Access:https://bspace.buid.ac.ae/handle/1234/1454
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1862980613462556672
author POOBAMPEN, PAVINEE
author_facet POOBAMPEN, PAVINEE
author_role author
dc.creator.none.fl_str_mv POOBAMPEN, PAVINEE
dc.date.none.fl_str_mv 2017-11
2019-08-27T07:31:58Z
2019-08-27T07:31:58Z
dc.format.none.fl_str_mv application/pdf
dc.identifier.none.fl_str_mv 2015303007
https://bspace.buid.ac.ae/handle/1234/1454
dc.language.none.fl_str_mv en
dc.publisher.none.fl_str_mv The British University in Dubai (BUiD)
dc.subject.none.fl_str_mv event projects
United Arab Emirates (UAE)
Dubai
temporary structures
dc.title.none.fl_str_mv The Influence of Risks on the Success of the Development and Installation of Temporary Structure in Event Projects in Dubai
dc.type.none.fl_str_mv Dissertation
description The number of events in Dubai is getting increased and the temporary structures have been widely used as a mandatory element to support the event’s venue whether to expand the capability of the venue or to create the ambience for the event. Purpose – This study aims to recognize the risks arising throughout the project life cycle of temporary structure and seeking the influence of risks on the success of temporary structure in the event projects. Design/methodology/approach – The basic research knowledge was carried out through a comprehensive literature review which supported to identify the risks throughout the project life cycle including the success criteria for the temporary structure in event projects. Then the quantitative research method was done for collecting data and determining the risk significance. Findings – The study has summarized the project life cycle of temporary structure into four phases and categorized potential risks according to the project phase: 10 risks during Pre Erection 11 risks during Erection phase, 8 risks during Event phase and 8 risks during Demolition phase. Three aspects of success criteria for the temporary structure project are cost, time and safety. Research finding shows that risks arise during Erection phase are likely to be crucial as risks present the most significant influence on the success of temporary structure project, followed by risks during Pre-Erection phase. Event risks and Demolition risks present less significant influence on the project success. Limitations – The data for this study was collected from only three organizations involved in the temporary structure in event projects in Dubai. The study findings have provided basic knowledge to manage the risks in the temporary project but cannot be implied to every temporary structure projects which is suggested to expand the sampling size and cover the client’s opinion.
id budr_b35b508a795f5d8aebd019e7b0d3cb23
identifier_str_mv 2015303007
language_invalid_str_mv en
network_acronym_str budr
network_name_str The British University in Dubai repository
oai_identifier_str oai:bspace.buid.ac.ae:1234/1454
publishDate 2017
publisher.none.fl_str_mv The British University in Dubai (BUiD)
repository.mail.fl_str_mv
repository.name.fl_str_mv
repository_id_str
spelling The Influence of Risks on the Success of the Development and Installation of Temporary Structure in Event Projects in DubaiPOOBAMPEN, PAVINEEevent projectsUnited Arab Emirates (UAE)Dubaitemporary structuresThe number of events in Dubai is getting increased and the temporary structures have been widely used as a mandatory element to support the event’s venue whether to expand the capability of the venue or to create the ambience for the event. Purpose – This study aims to recognize the risks arising throughout the project life cycle of temporary structure and seeking the influence of risks on the success of temporary structure in the event projects. Design/methodology/approach – The basic research knowledge was carried out through a comprehensive literature review which supported to identify the risks throughout the project life cycle including the success criteria for the temporary structure in event projects. Then the quantitative research method was done for collecting data and determining the risk significance. Findings – The study has summarized the project life cycle of temporary structure into four phases and categorized potential risks according to the project phase: 10 risks during Pre Erection 11 risks during Erection phase, 8 risks during Event phase and 8 risks during Demolition phase. Three aspects of success criteria for the temporary structure project are cost, time and safety. Research finding shows that risks arise during Erection phase are likely to be crucial as risks present the most significant influence on the success of temporary structure project, followed by risks during Pre-Erection phase. Event risks and Demolition risks present less significant influence on the project success. Limitations – The data for this study was collected from only three organizations involved in the temporary structure in event projects in Dubai. The study findings have provided basic knowledge to manage the risks in the temporary project but cannot be implied to every temporary structure projects which is suggested to expand the sampling size and cover the client’s opinion.The British University in Dubai (BUiD)2019-08-27T07:31:58Z2019-08-27T07:31:58Z2017-11Dissertationapplication/pdf2015303007https://bspace.buid.ac.ae/handle/1234/1454enoai:bspace.buid.ac.ae:1234/14542021-09-20T13:25:23Z
spellingShingle The Influence of Risks on the Success of the Development and Installation of Temporary Structure in Event Projects in Dubai
POOBAMPEN, PAVINEE
event projects
United Arab Emirates (UAE)
Dubai
temporary structures
title The Influence of Risks on the Success of the Development and Installation of Temporary Structure in Event Projects in Dubai
title_full The Influence of Risks on the Success of the Development and Installation of Temporary Structure in Event Projects in Dubai
title_fullStr The Influence of Risks on the Success of the Development and Installation of Temporary Structure in Event Projects in Dubai
title_full_unstemmed The Influence of Risks on the Success of the Development and Installation of Temporary Structure in Event Projects in Dubai
title_short The Influence of Risks on the Success of the Development and Installation of Temporary Structure in Event Projects in Dubai
title_sort The Influence of Risks on the Success of the Development and Installation of Temporary Structure in Event Projects in Dubai
topic event projects
United Arab Emirates (UAE)
Dubai
temporary structures
url https://bspace.buid.ac.ae/handle/1234/1454