An Uncertainty Based Genetic Algorithm Approach for Project Resource Scheduling
This research is tackling the issue of complex resources scheduling in project management. In traditional planning tools, resource allocation is sequence based. This normally results in a very simple baseline schedule. However, in reality, the problem of project scheduling is more complex and it dep...
محفوظ في:
| المؤلف الرئيسي: | ALKETBI, SAIF (author) |
|---|---|
| منشور في: |
2016
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | http://bspace.buid.ac.ae/handle/1234/1024 |
| الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
The attitude of project managers toward using Microsoft project for planning and scheduling. (c1997)
حسب: Yafawi, Khalil Ibrahim
منشور في: (1997) -
Integrated Material Lot Sizing and Multi-Resource Leveling Models with Activity Splitting
حسب: Almatroushi, Hessa
منشور في: (2015) -
Project Crisis Management Techniques to Overcome the Problems of Schedule Delays and Cost Overruns
حسب: Halloum, Mohammad
منشور في: (2010) -
Efficient Dynamic Cost Scheduling Algorithm for Data Batch Processing
حسب: Al Sadawi, Alia
منشور في: (2016) -
Multi-Mode Resource Constrained Project Scheduling Problem with Material Ordering to Maximize NPV
حسب: Kashwani, Nour Ahmed
منشور في: (2018)