Life Cycle Cost Analysis as a Technique to Reduce Project’s Cost Overruns of Assets in UAE: A Case Study-Based Research
Infrastructure projects run by two government organisations, Telecom Operator and Water and Electricity Authority, in Abu Dhabi, UAE are suffering from cost overruns during their life cycle. In 13 projects investigated from both organisations, it was found that the cost overruns were approximately e...
محفوظ في:
| المؤلف الرئيسي: | El Gergawy, Yahia (author) |
|---|---|
| منشور في: |
2011
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | http://bspace.buid.ac.ae/handle/1234/334 |
| الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Project Crisis Management Techniques to Overcome the Problems of Schedule Delays and Cost Overruns
حسب: Halloum, Mohammad
منشور في: (2010) -
An Exploration of the Causes of Cost Overruns in Public Sector Infrastructure Projects in the United Arab Emirates (UAE): A Stakeholder Perspective
حسب: FANOUSSE, RIM IMAD
منشور في: (2017) -
A Study on the impact of leadership traits on projects success and cost overrun: the case of project based construction organisations in the UAE
حسب: GOUDEH, SEIF ABD ELMAOWLA
منشور في: (2018) -
SYSTEM DYNAMICS APPROACH FOR WHOLE LIFE CYCLE COST MODELLING OF RESIDENTIAL BUILDING PROJECTS IN UNITED ARAB EMIRATES
حسب: Sadek, Ahmed
منشور في: (2020) -
The influence of risks on the outturn cost of ICT infrastructure network projects
حسب: Almarri, Khalid
منشور في: (2021)