Modelling the final cost of construction projects in Kingdom of Bahrain
The report aimed at providing the insight towards the various factors in the construction industry which add up to the cost of the project. The report identifies the relation of the project cost with several factors which are considered to be dependable or independent. The research work recognizes t...
محفوظ في:
| المؤلف الرئيسي: | MOHAMMED, BADER NASSER (author) |
|---|---|
| منشور في: |
2017
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | https://bspace.buid.ac.ae/handle/1234/1245 |
| الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Democratization in Bahrain. (c2006)
حسب: Ghaith, Hisham
منشور في: (2006) -
A Study on the impact of leadership traits on projects success and cost overrun: the case of project based construction organisations in the UAE
حسب: GOUDEH, SEIF ABD ELMAOWLA
منشور في: (2018) -
The Sustainability (Environmental and Economical) impact of upgrading Bahrain building regulations for affordable housing units: Case study in Bahrain
حسب: Al-Saffar, May
منشور في: (2014) -
A Framework for Project Time-Cost Optimization Considering Float Consumption Impact
حسب: Al Haj, Rana Ali
منشور في: (2012) -
Prolongation Cost as a Remedy for Construction Contracts Delays
حسب: Hasweh, Hazem Nabeel Khamis
منشور في: (2016)