Model for Improving the level of Labourers Productivity through the Use o BIM and Clould technology in UAEBuilding Construction Projects

Importance of the research This study examined the capabilities of building information modelling (BIM) and cloud technologies and their impact on improving labourers’ productivity in building construction projects in the United Arab Emirates (UAE). Thus, there was a need for this research to identi...

Full description

Saved in:
Bibliographic Details
Main Author: Muneer Shahatit (author)
Published: 2023
Subjects:
Online Access:https://bspace.buid.ac.ae/handle/1234/2596
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1862980613889327104
author Muneer Shahatit
author_facet Muneer Shahatit
author_role author
dc.creator.none.fl_str_mv Muneer Shahatit
dc.date.none.fl_str_mv 2023-12-05
2024-05-08T10:50:30Z
2024-05-08T10:50:30Z
dc.format.none.fl_str_mv application/pdf
dc.identifier.none.fl_str_mv https://bspace.buid.ac.ae/handle/1234/2596
dc.language.none.fl_str_mv en
dc.publisher.none.fl_str_mv The British University in Dubai
dc.subject.none.fl_str_mv construction labourers’ productivity, UAE construction sector, digital construction technology, Building Information Modelling (BIM), cloud technology
dc.title.none.fl_str_mv Model for Improving the level of Labourers Productivity through the Use o BIM and Clould technology in UAEBuilding Construction Projects
description Importance of the research This study examined the capabilities of building information modelling (BIM) and cloud technologies and their impact on improving labourers’ productivity in building construction projects in the United Arab Emirates (UAE). Thus, there was a need for this research to identify the key factors affecting labourers’ productivity in construction projects in the UAE and their impact magnitude. Problem and aim The research aimed to examine how advanced technologies such as BIM and cloud could be used to improve labourers’ productivity during the delivery of building construction projects in the UAE. The research proposed a model that comprises of Building Information Modelling (BIM) and cloud technology determinants that could be used to improve labourers’ productivity in the UAE building construction sector. Method The study adopted a quantitative method approach to achieve the intended research objectives. The population of the study comprised construction contractors and consultants working on building construction projects in the UAE. The key targeted participants who provided the data required for this study were project managers, supervisors, foremen, inspectors, project engineers, and consultant resident engineers. Analysis was performed using IBM-SPSS and Hayes process. Findings The research proposed and validated a model that comprises BIM, cloud technology and labourers’ productivity determinants that can be used to improve labourers’ productivity in the UAE building construction sector. As shown in this study, the advancement of BIM and cloud technologies can democratize access to vital information, tools, and techniques, which can be used to create a collaborative team environment. Within the context of the UAE, this research has also shown how these technologies have emerged as a means of improving productivity in the construction sector. Conclusion The research identified several factors affecting construction labourers’ productivity. Among the 42 factors identified from the reviewed literature. From the findings of the study, it was found that the UAE construction sector is still facing labourers’ productivity challenges, and the industry has one of the lowest productivity rates. As a result, it was revealed that implementing BIM and cloud technologies facilitates the successful delivery of building construction projects. In addition, the study further established that BIM and cloud technologies can be used to facilitate integrated project delivery. Future research The study achieved its main aim of proposing a model that comprises BIM and labourers’ productivity determinants’. Although the findings and the conclusion of the study have added value to the existing knowledge on the use of BIM to improve labourers’ productivity in the UAE, it is important that further research is carried out in the form of a case study to evaluate the impact of the model’s proposed context.
id budr_e43c0a8db3c8d893453c37d4dfe3af75
language_invalid_str_mv en
network_acronym_str budr
network_name_str The British University in Dubai repository
oai_identifier_str oai:bspace.buid.ac.ae:1234/2596
publishDate 2023
publisher.none.fl_str_mv The British University in Dubai
repository.mail.fl_str_mv
repository.name.fl_str_mv
repository_id_str
spelling Model for Improving the level of Labourers Productivity through the Use o BIM and Clould technology in UAEBuilding Construction ProjectsMuneer Shahatitconstruction labourers’ productivity, UAE construction sector, digital construction technology, Building Information Modelling (BIM), cloud technologyImportance of the research This study examined the capabilities of building information modelling (BIM) and cloud technologies and their impact on improving labourers’ productivity in building construction projects in the United Arab Emirates (UAE). Thus, there was a need for this research to identify the key factors affecting labourers’ productivity in construction projects in the UAE and their impact magnitude. Problem and aim The research aimed to examine how advanced technologies such as BIM and cloud could be used to improve labourers’ productivity during the delivery of building construction projects in the UAE. The research proposed a model that comprises of Building Information Modelling (BIM) and cloud technology determinants that could be used to improve labourers’ productivity in the UAE building construction sector. Method The study adopted a quantitative method approach to achieve the intended research objectives. The population of the study comprised construction contractors and consultants working on building construction projects in the UAE. The key targeted participants who provided the data required for this study were project managers, supervisors, foremen, inspectors, project engineers, and consultant resident engineers. Analysis was performed using IBM-SPSS and Hayes process. Findings The research proposed and validated a model that comprises BIM, cloud technology and labourers’ productivity determinants that can be used to improve labourers’ productivity in the UAE building construction sector. As shown in this study, the advancement of BIM and cloud technologies can democratize access to vital information, tools, and techniques, which can be used to create a collaborative team environment. Within the context of the UAE, this research has also shown how these technologies have emerged as a means of improving productivity in the construction sector. Conclusion The research identified several factors affecting construction labourers’ productivity. Among the 42 factors identified from the reviewed literature. From the findings of the study, it was found that the UAE construction sector is still facing labourers’ productivity challenges, and the industry has one of the lowest productivity rates. As a result, it was revealed that implementing BIM and cloud technologies facilitates the successful delivery of building construction projects. In addition, the study further established that BIM and cloud technologies can be used to facilitate integrated project delivery. Future research The study achieved its main aim of proposing a model that comprises BIM and labourers’ productivity determinants’. Although the findings and the conclusion of the study have added value to the existing knowledge on the use of BIM to improve labourers’ productivity in the UAE, it is important that further research is carried out in the form of a case study to evaluate the impact of the model’s proposed context.The British University in Dubai2024-05-08T10:50:30Z2024-05-08T10:50:30Z2023-12-05application/pdfhttps://bspace.buid.ac.ae/handle/1234/2596enoai:bspace.buid.ac.ae:1234/25962024-05-08T23:00:39Z
spellingShingle Model for Improving the level of Labourers Productivity through the Use o BIM and Clould technology in UAEBuilding Construction Projects
Muneer Shahatit
construction labourers’ productivity, UAE construction sector, digital construction technology, Building Information Modelling (BIM), cloud technology
title Model for Improving the level of Labourers Productivity through the Use o BIM and Clould technology in UAEBuilding Construction Projects
title_full Model for Improving the level of Labourers Productivity through the Use o BIM and Clould technology in UAEBuilding Construction Projects
title_fullStr Model for Improving the level of Labourers Productivity through the Use o BIM and Clould technology in UAEBuilding Construction Projects
title_full_unstemmed Model for Improving the level of Labourers Productivity through the Use o BIM and Clould technology in UAEBuilding Construction Projects
title_short Model for Improving the level of Labourers Productivity through the Use o BIM and Clould technology in UAEBuilding Construction Projects
title_sort Model for Improving the level of Labourers Productivity through the Use o BIM and Clould technology in UAEBuilding Construction Projects
topic construction labourers’ productivity, UAE construction sector, digital construction technology, Building Information Modelling (BIM), cloud technology
url https://bspace.buid.ac.ae/handle/1234/2596