Impact of ‘back to back’ payment clause on the cash flow of subcontractor in the UAE
Any default by the employer, by not paying on time or nonpaying at all, will adversely affect the parties down in the supply chain in construction project. The contractor tries to cope with such problem by limiting his liability via terms in the contract, such as back-to-back payment terms, with his...
محفوظ في:
| المؤلف الرئيسي: | Bader, Mahmoud Fathi (author) |
|---|---|
| منشور في: |
2013
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | http://bspace.buid.ac.ae/handle/1234/507 |
| الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
The Security of Payments in Construction Projects
حسب: HAMARSHEH, MOHAMMAD ORAIB
منشور في: (2025) -
The prediction of future cash flows based on operating cash flows, earnings and accruals in the French context
حسب: Benjamin, Noury
منشور في: (2020) -
Contract Claims in UAE Residential Construction Projects
حسب: Shalabi, Mohamed Khaled Ali Hassan
منشور في: (2024) -
Contractor Entitlement To Payments Under UAE And Singapore Law
حسب: ALOBAIDI, NOORULHUDA
منشور في: (2025) -
Dealing with Late Payments - A Challenge for UAE Small Scale Subcontractors?
حسب: Purayil, Abdulla Poomangalorakath Puthiya
منشور في: (2015)