Pesquisas alternativas:
"adjust phase shifts" » "adjusted phase shifts" (Expandir a Pesquisa), "adjust phase shift" (Expandir a Pesquisa)
"adjust phase shifts" » "adjusted phase shifts" (Expandir a Pesquisa), "adjust phase shift" (Expandir a Pesquisa)
-
1
-
2
Outage probability versus power allocation factors, with m = 2, = = 1 [BPCU] and = 5 [dB].
Publicado em 2025Assuntos: -
3
-
4
-
5
Ergodic data rate versus the transmit power , with N = 5, m = 1, = 0.1, = 0.9 and = 5 [dB].
Publicado em 2025Assuntos: -
6
-
7
Comparison of this work with existing studies (✓: considered; ✗: not considered).
Publicado em 2025Assuntos: -
8
Outage probability versus the transmit power budget, with N = 5, m = 1 and = 5 [dBm].
Publicado em 2025Assuntos: -
9
System throughput versus the transmit power budget, with m = 1, = 0.1, = 0.9 and = 5 [dB].
Publicado em 2025Assuntos: -
10
-
11
Outage probability versus the reflection amplitude factors , with N = 8, m = 1, = 10 [dB] and = = 1.5 [BPCU].
Publicado em 2025Assuntos: -
12
Outage probability versus the transmit power budget, with N = 5, = 5, m = 1, = 5 [dBm] and = = 1.5 [BPCU].
Publicado em 2025Assuntos: -
13
Ergodic data rate versus the reflection amplitude factors , with N = 4, m = 1 and = 5 [dB].
Publicado em 2025Assuntos: -
14
Ergodic data rate versus the number of elements N, with = 5, m = 1 and power budget = 15 [dB].
Publicado em 2025Assuntos: -
15