Dárkkuhitgo:
"paper presents" » "paper present" (Viiddit ozu), "paper represents" (Viiddit ozu), "paper presented" (Viiddit ozu)
"paper presents" » "paper present" (Viiddit ozu), "paper represents" (Viiddit ozu), "paper presented" (Viiddit ozu)
-
1
-
2
-
3
-
4
Outage probability versus power allocation factors, with m = 2, = = 1 [BPCU] and = 5 [dB].
Almmustuhtton 2025Fáttát: -
5
-
6
-
7
Ergodic data rate versus the transmit power , with N = 5, m = 1, = 0.1, = 0.9 and = 5 [dB].
Almmustuhtton 2025Fáttát: -
8
-
9
Comparison of this work with existing studies (✓: considered; ✗: not considered).
Almmustuhtton 2025Fáttát: -
10
Outage probability versus the transmit power budget, with N = 5, m = 1 and = 5 [dBm].
Almmustuhtton 2025Fáttát: -
11
System throughput versus the transmit power budget, with m = 1, = 0.1, = 0.9 and = 5 [dB].
Almmustuhtton 2025Fáttát: -
12
-
13
-
14
Outage probability versus the transmit power budget, with N = 5, = 5, m = 1, = 5 [dBm] and = = 1.5 [BPCU].
Almmustuhtton 2025Fáttát: -
15
Ergodic data rate versus the reflection amplitude factors , with N = 4, m = 1 and = 5 [dB].
Almmustuhtton 2025Fáttát: -
16
Ergodic data rate versus the number of elements N, with = 5, m = 1 and power budget = 15 [dB].
Almmustuhtton 2025Fáttát: -
17