-
1
-
2
-
3
-
4
Outage probability versus power allocation factors, with m = 2, = = 1 [BPCU] and = 5 [dB].
Publicerad 2025Ämnen: -
5
-
6
-
7
Ergodic data rate versus the transmit power , with N = 5, m = 1, = 0.1, = 0.9 and = 5 [dB].
Publicerad 2025Ämnen: -
8
-
9
Comparison of this work with existing studies (✓: considered; ✗: not considered).
Publicerad 2025Ämnen: -
10
Outage probability versus the transmit power budget, with N = 5, m = 1 and = 5 [dBm].
Publicerad 2025Ämnen: -
11
System throughput versus the transmit power budget, with m = 1, = 0.1, = 0.9 and = 5 [dB].
Publicerad 2025Ämnen: -
12
-
13
-
14
-
15
Ergodic data rate versus the reflection amplitude factors , with N = 4, m = 1 and = 5 [dB].
Publicerad 2025Ämnen: -
16
-
17