Search alternatives:
decrease » increase (Expand Search)
Showing 481 - 500 results of 612 for search '(((((( terms decrease ) OR ( peter decrease ))) OR ( metermsmt decrease ))) OR ( mean decrease ))*', query time: 0.11s Refine Results
  1. 481
  2. 482
  3. 483
  4. 484
  5. 485
  6. 486
  7. 487
  8. 488
  9. 489
  10. 490
  11. 491
  12. 492
  13. 493
  14. 494
  15. 495
  16. 496

    Enhanced PSO-Based NN for Failures Detection in Uncertain Wind Energy Systems by Khaled Dhibi (16891524)

    Published 2023
    “…The proposed methodology improves the diagnosis abilities, reduces the computation time, and decreased the storage cost. The presented experimental results prove the high performance of the suggested paradigms in terms of computation time and accuracy.…”
  17. 497

    TCAD Simulation and Analysis of Selective Buried Oxide MOSFET Dynamic Power by Mahmoud, Rana

    Published 2019
    “…The authors have previously investigated and reported the characteristics of the SELBOX structure in terms of kink effect, frequency, thermal and static power characteristics. …”
    Get full text
    article
  18. 498

    Evaluation of Workability and Structuration Rate of Locally Developed 3D Printing Concrete Using Conventional Methods by Ahmed, Sara

    Published 2022
    “…However, for printed specimens, the compressive strength decreased with the increase in a/b ratio due to increased thixotropy. …”
    Get full text
    article
  19. 499

    Developing a Stochastic Model to Predict Cost Overrun due to the Causes of Projects Delay in Oil Fields Construction Industry by ALKHOORI, KHALID ABDUL MAJEED

    Published 2020
    “…While most of the previous research investigated the causes of project delay in general construction, very little research exists specifically on oil fields construction projects in terms of budget overrun. The main aim of the research is to establish a model that could be used to map the causes of projects delay to the cost overrun in oil fields construction projects and to investigate the variables that contribute to budget/cost overrun. …”
    Get full text
  20. 500