يعرض 741 - 760 نتائج من 970 نتيجة بحث عن '(((((( terms decrease ) OR ( peters decrease ))) OR ( meter decrease ))) OR ( mean increase ))*', وقت الاستعلام: 0.11s تنقيح النتائج
  1. 741
  2. 742
  3. 743
  4. 744
  5. 745
  6. 746
  7. 747
  8. 748
  9. 749
  10. 750
  11. 751
  12. 752
  13. 753
  14. 754
  15. 755
  16. 756
  17. 757

    Enhanced PSO-Based NN for Failures Detection in Uncertain Wind Energy Systems حسب Khaled Dhibi (16891524)

    منشور في 2023
    "…The proposed methodology improves the diagnosis abilities, reduces the computation time, and decreased the storage cost. The presented experimental results prove the high performance of the suggested paradigms in terms of computation time and accuracy.…"
  18. 758

    TCAD Simulation and Analysis of Selective Buried Oxide MOSFET Dynamic Power حسب Mahmoud, Rana

    منشور في 2019
    "…The authors have previously investigated and reported the characteristics of the SELBOX structure in terms of kink effect, frequency, thermal and static power characteristics. …"
    احصل على النص الكامل
    article
  19. 759

    Evaluation of Workability and Structuration Rate of Locally Developed 3D Printing Concrete Using Conventional Methods حسب Ahmed, Sara

    منشور في 2022
    "…However, for printed specimens, the compressive strength decreased with the increase in a/b ratio due to increased thixotropy. …"
    احصل على النص الكامل
    article
  20. 760

    Developing a Stochastic Model to Predict Cost Overrun due to the Causes of Projects Delay in Oil Fields Construction Industry حسب ALKHOORI, KHALID ABDUL MAJEED

    منشور في 2020
    "…While most of the previous research investigated the causes of project delay in general construction, very little research exists specifically on oil fields construction projects in terms of budget overrun. The main aim of the research is to establish a model that could be used to map the causes of projects delay to the cost overrun in oil fields construction projects and to investigate the variables that contribute to budget/cost overrun. …"
    احصل على النص الكامل