Showing 1 - 20 results of 71 for search '(((( elementi per algorithm ) OR ( element method algorithm ))) OR ( level scheduling algorithm ))', query time: 0.14s Refine Results
  1. 1
  2. 2

    Activity-level space scheduling by Zouein, Pierrette P.

    Published 1992
    “…Activity-level space scheduling involves allocating site space over time to static and dynamic construction resources such as robots. …”
    Get full text
    Get full text
    Get full text
    conferenceObject
  3. 3
  4. 4

    Improvement Algorithm for Limited Space Scheduling by Zouein, Pierrette

    Published 2001
    “…The model characterizes resource space requirements over time and establishes a time-space relationship for each activity in the schedule, based on alternative resource levels. An example illustrates the presented algorithm that generates a feasible space schedule.…”
    Get full text
    Get full text
    article
  5. 5
  6. 6

    Scheduling and allocation in high-level synthesis using stochastic techniques by Sait, Sadiq M.

    Published 2020
    “…In this work, a unique approach to scheduling and allocation problem using the genetic algorithm (GA) is described. …”
    Get full text
    article
  7. 7
  8. 8

    Concurrent BIST Synthesis and Test Scheduling Using Genetic Algorithms by Harmanani, H. M.

    Published 2007
    “…This paper presents an efficient method for concurrent built-in self-test synthesis and test scheduling in high-level synthesis. The method maximizes concurrent testing of modules while performing the allocation of functional units, test registers, and interconnects. …”
    Get full text
    Get full text
    Get full text
    article
  9. 9

    Efficient Dynamic Cost Scheduling Algorithm for Financial Data Supply Chain by Al Sadawi, Alia

    Published 2021
    “…An iterative dynamic scheduling algorithm (DCSDBP) was developed to address the data batching process. …”
    Get full text
    article
  10. 10
  11. 11

    MoveSchedule by Zouein, Pierette

    Published 1995
    “…MoveSchedule establishes a time-space relationship for each activity in the schedule based on alternative resource levels so that tradeoffs between activity duration and space need on site are possible. …”
    Get full text
    Get full text
    Get full text
    masterThesis
  12. 12
  13. 13
  14. 14

    A reduced model for phase-change problems with radiation using simplified PN approximations by Belhamadia, Youssef

    Published 2025
    “…The integro-differential equation for the full radiative transfer is replaced by a set of differential equations which are independent of the angle variable and easy to solve using conventional computational methods. To solve the coupled equations, we implement a second-order implicit scheme for the time integration and a mixed finite element method for the space discretization. …”
    Get full text
    article
  15. 15
  16. 16
  17. 17

    Monitoring Bone Density Using Microwave Tomography of Human Legs: A Numerical Feasibility Study by Alkhodari, Mohanad Ahmed

    Published 2021
    “…This study was performed using an in-house finite-element method contrast source inversion algorithm (FEM-CSI). …”
    Get full text
    article
  18. 18
  19. 19
  20. 20